My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-162
>
Meetings
>
2022
>
08. August
>
2022-08-16 10:00 AM - Commissioners' Agenda
>
RES-2022-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2022 11:08:02 AM
Creation date
8/22/2022 11:07:36 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution for an Amended 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
7
Placement
Consent Agenda
Row ID
92653
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oFz <br />IUFzo <br />C) <br />l!o <br />tuJ <br />dl <br />t- <br />Table of Gontents <br />lntroduction <br />1.1, Project Purpose....... <br />1.3. Design Codes and References...... <br />1.3.1. Department of Ecology <br />1.2, Report Purpose....... <br />1 <br />,1 <br />1 <br />1 <br />1 <br />1 <br />a <br />2 <br />2 <br />2 <br />3 <br />3 <br />3 <br />4 <br />4 <br />4 <br />6 <br />6 <br />6 <br />8 <br />I <br />I <br />q <br />1.3.2. City of Roslyn <br />2 Basin Description ... ...... <br />2.1. General <br />2.2. Historic and Existing Conditions <br />2.3. Proposed Conditions <br />3. Project Site Descriplion <br />3. 1. Project Limits........... <br />4 <br />5. <br />b. <br />3.2. Project Site Gonditions................. <br />3.3. Stormwater Features. <br />Core Element Analysis ......... <br />Alternatives Considered ....... <br />Design Analysis <br />6.1. Existing Stormwater Drainage System <br />6.2. Proposed BMP Design and lmprovements. <br />7 Water Qualily Benefit.,.... <br />7.1. Runoff Treatment Comparison. <br />7.2. Equivalent New/Redevelopment Areas <br />L Capital lmprovement P|an........... <br />EXHIBITS <br />Exhibit 1 - Basin and Study Map <br />APPENDICES <br />Appendix A - Drainage Parameters <br />Appendix B - Existing Flow Rates <br />Appendix G - Swale Calculations <br />Appendix D - Equivalent New Redevelopment Areas for Biofiltration Swales Calculations Sheet <br />Appendix E - CIP 1 Cost Estimate <br />Appendix F - Operations and Maintenance Tables
The URL can be used to link to this page
Your browser does not support the video tag.