My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-162
>
Meetings
>
2022
>
08. August
>
2022-08-16 10:00 AM - Commissioners' Agenda
>
RES-2022-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2022 11:08:02 AM
Creation date
8/22/2022 11:07:36 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution for an Amended 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
7
Placement
Consent Agenda
Row ID
92653
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NARRATIVE <br />1. Project Description: Descrlbe the scope of work. lndicate the major work involved, including a brief <br />comparison of exlstlng and proposed conditions. <br />The City of Roslyn drains to Crystal Creek, an impaired waterbody. The Stormwater Retrofit and CIP <br />Construction will include a city-wide installation of low impact development (LID) best management <br />practices (BMP) to improve water quality as part of the CIPI Project and in line with implementation of <br />the City's planned capital improvement projects (CIP). The project will include stormwater retrofits for <br />improved water quality in conjunction with the on-going CIP l, a funded pipe rehabilitation project <br />curently at90Vo design. The goals are to construct BMPs that will improve flow control and reduce <br />flooding and pollutant discharges to the impaired waterway within the City of Roslyn, Crystal Creek. <br />Overall the City is requesting $262,500 for construction to complete a proiect where the total costs will <br />be approximately $3-million dollars. The attached Figures include the project area. The attached <br />Schedule and Budget include detailed Tasks for the Scope of Work. The attached Stormwater <br />Comprehensive Plan addendum includes detailed project information. <br />2. Explain how the infrastructure project will help me6t the economlc development goals of your community <br />and/or reglon. lf thia project is not done, will the anticipated private development still take place? <br />The City currently experiences flooding in the downtown core due to undersized stormwater drains, and <br />adverse environmental impacts from the lack of water quality treatment within the same drainage basin. <br />The infrastructure project will help meet the economic development goals of the community by <br />providing an adequate stormwater system that will allow groMh. Private commercial development is not <br />currently planned within the drainage basin as any new commercial development or redevelopment is <br />limited by the capacity of the stormwater system. If the infrastructure project is not done the economic <br />development goals for the City will continue to be limited. <br />3. lndicate if the project is consistent with the following applicable state, regional and local plans andprioritization processee: <br />trovera|lEconomicDevelopmentPlan-officiallyAdopted- <br />f Comprehensive Land Use Plan - Officialty Adopted 2019 <br />I Capital Facility Plan - Officialty Adopted 2019 <br />tr Community Action Plan (or other community-based plan) - Officially Adopted_ <br />Six.YearTransportationlmprovementPlan-officiallyAdopted <br />site-specific development plans; e.9., community Master Plan - officially Adopted <br />3 <br />tr other
The URL can be used to link to this page
Your browser does not support the video tag.