My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_City of Roslyn_PF Funding Award Agmt
>
Meetings
>
2022
>
08. August
>
2022-08-16 10:00 AM - Commissioners' Agenda
>
Resolution_City of Roslyn_PF Funding Award Agmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 12:03:07 PM
Creation date
8/11/2022 12:02:00 PM
Metadata
Fields
Template:
Meeting
Date
8/16/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution for an Amended 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
7
Placement
Consent Agenda
Row ID
92653
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Public Benefit: <br />Please describe the public benefit derived from project completion. <br />The public benefits not only from the economic development opportunities, but also from the protection <br />of surface water bodies as road runoff from the urban area is treated through bioretention before <br />discharging into Crystal Creek. In addition, there is recognition that treating road runoff does prevent <br />contaminants from reaching surface water bodies, protecting both human and wildlife from exposure to <br />toxins that can be lethal to aquatic life or accumulate in fish, wildlife and human tissue. <br />6. Define the total number of project partners demonstrating project support. <br />The Department of Ecology is currently the only partner and providing 85% of the funding. <br />6. Explain how construction ready this infrastructure project is relative to design completeness and the <br />permitting process. <br />Design Completeness - The alternatives analysis has been completed and the design is currently fully <br />funded with the Consultant (Mead&Hunt) preparing to submit the 30% level Plans and Specifications to <br />the City and Ecology for review. <br />Permitting Process - The project is in the review process for the Inadvertent Discovery Plan and <br />preparation of the SEPA Checklist. Survey work has already been completed and the geotechnical <br />investigation work is planned for December 2021. <br />7. Indicate the Estimated Number of Short Term and/or Permanent Jobs Created/Retained by the Project. <br />Estimated Short Term Jobs created by the project would include jobs for consultants and contractors. <br />Consultant teams include at least (2) archaeologists, (2) geotechnical/soils professionals, (3) surveyors, <br />(3) design engineers. Contractor jobs are anticipated to be in the 15-20 range for tradespeople including <br />subcontractors. <br />The infrastructure project allows for the creation of development and/or redevelopment within the <br />drainage basin. Permanent jobs are anticipated as part of any development after the infrastructure project <br />is completed. Per Chapter 5 (Economic Development) of the City's Comprehensive Plan the employment <br />capacity is an additional 202 jobs. <br />Submit the original application to: <br />Khthas County Department of Public Works <br />411 Na Ruby, Suite #1 <br />IE e nsbuurg, WA 98926 <br />
The URL can be used to link to this page
Your browser does not support the video tag.