My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_FaustRdBridge
>
Meetings
>
2022
>
08. August
>
2022-08-02 10:00 AM - Commissioners' Agenda
>
Resolution_FaustRdBridge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 9:21:44 AM
Creation date
7/28/2022 12:12:29 PM
Metadata
Fields
Template:
Meeting
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
j
Item
Request to Approve a Resolution to Establish County Road Project (CRP) Number Supporting the Replacement of Bridge #88212 Faust Road over Town Ditch
Order
1
Placement
Consent Agenda
Row ID
92041
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 316-22 JOB NO: RC 2195 -BR <br />IT IS HEREBY RESOLVED that Faust Rd Bridge #88212 be improved as follows: <br />The project will replace the existing single span, structurally deficient, load posted concrete bridge with a single span, <br />prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening. <br />ARTERIAL <br />ACCESS X <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />0 <br />R <br />AD <br />07 <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELMINARY ENGINEERING <br />$ 690,831.00 <br />CONSTRUCTION ENGINEERING <br />$ 497,399.00 <br />RIGHT-OF-WAY ACQUISITION <br />$ 100,000.00 <br />SUB -TOTAL <br />$ 1,288,230.00 <br />County Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />$ 1,243,570.00 <br />SUB -TOTAL <br />$ 1,243,570.00 <br />TOTAL PROJECT COST <br />$ 2,531,800.00 <br />GRANT OR OTHER FUNDS <br />$ <br />Grant source: FY 2022 WSDOT Local Bridge <br />Program <br />is <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />0 <br />Joshua Fredrickson, P.E. <br />County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-18. <br />ADOPTED this day of <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Laura Osiadacz, Chair <br />i_ <br />2022 Attest: <br />Clerk of the Board <br />Cory Wright, Vice -Chair Brett Wachsmith, Commissioner <br />g:\base\forms\eng\crp-frm 7/25/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.