My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Latecomer agreement and reimbursement
>
Meetings
>
2022
>
08. August
>
2022-08-02 10:00 AM - Commissioners' Agenda
>
Latecomer agreement and reimbursement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 12:13:16 PM
Creation date
7/28/2022 12:12:28 PM
Metadata
Fields
Template:
Meeting
Date
8/2/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
f
Item
Request to Approve a Latecomer Agreement with City of Ellensburg
Order
6
Placement
Consent Agenda
Row ID
92041
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iBXI·llí3\TA.eKITTifÄCQQNÏYJRANSE(RŠTATlúNßEW$8REIMBURS$MENT,AGREElvlENÏSR97andE/WCollectorStreetSewerMainExtenslonTotalCostsDescrlptionQuantityUnitCostTotalMobilization1LS$25,200.37$25,200.37PVCSewerMaln-8"825LF$48,00$39,600.00PVCSewerMaln-10"2595LF$68.00$150,510.00Manhole48"Dia.15EA$4,650.00$69,750.00Temp.TrafficControl1LS$1,734.35$1,734.35ShoringorExtraExcavation34360SF$0.50$17,180.00Subtotal303,974.72SalesTax8.3%26,229.90Total$'329,204.62ReimburseableCosts(Sewer)TotalSewerCosts=$329,204.62MinusOversizing28,103.85301,100.77Costdistributedequallyforbothsideofmaln.Therefore50%ofsewer$301,100.77/2=$150,550.39/3420LF=$88.04IFrontageFoot($101.25with15%cityadministrationcost)GR97andE/WCollectorStreetWaterMainExtensionTotalCostsDescription.QuantityUn\tCostTotalMobillzatlon1LŠ$38,399.82$38,399.82DIWaterMain-8"1845LF$63.00$116,235.0QButterflyValve-10"5EA$2,060.00$10,300.00AirVac.Assembly2EA$3,750.00$7,500.00BlowoffAssembly1EA$2,120.00$2,120.00HydrantAssembly.8EA$7,100,00$56,800.00DlWaterMaln-10"2580LF$74.00$190,920.00GateValve-8"8EA$1,650,00$13,200,00Temp.TrafflcControliLS$2,080.00$2,080.00Subtotal437,564.82SalesTax8.3%36,317.05Total$473,871.87RelmburseableCosts(Sewer)TotalSewerCosts$473,871.87MlnusOverslzing30,735.54443,136.33Costdistributedequallyforbothsideofmain.Therefore50%ofwater$443,136.33/2=$221,668.17}4425LF=$50.07IFrontageFoot($57.58with15%cityadministrationcost)
The URL can be used to link to this page
Your browser does not support the video tag.