My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-149_Redacted
>
Meetings
>
2022
>
07. July
>
2022-07-19 10:00 AM - Commissioners' Agenda
>
RES-2022-149_Redacted
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 10:21:58 AM
Creation date
7/26/2022 10:21:53 AM
Metadata
Fields
Template:
Meeting
Date
7/19/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Vantage Highway Over Cascade Canal (Bridge 893342) Replacement
Order
12
Placement
Consent Agenda
Row ID
91496
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County Public Works <br />Project Title Date <br />71t512022 <br />Right of Way <br />Z tto Right of Way Needed <br />* All construction required by the <br />contract can be accomplished <br />within the existing right of way. <br />! nignt of Way Needed <br />E ruo Relocation E Rebcation Required <br />Description of Utility Relocation orAdjustments and Existing Major Shuctures lnvolved in the Project <br />PSE gas line to be relocated by utility owner prior to construction <br />Consolidated Communications will move their copper and fiber communication lines prior to construction. <br />FM lnvolvement <br />ls any ai located within 3.2 kilometers (2 miles) of the proposed nYes M ruo <br />Remarks <br />No Airport within 2 miles <br />s project has been reviewed by the legislative body of the administration agency or agencies, or it's <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency <br />Date <br />Mayor/Chairperson <br />Thi <br />DOT Form 140-101 <br />Revised 0112022 <br />"Tlrqla4 <br />Utilities Railroad <br />n ruo utility work required <br />M rut utility work will be completed prior to the start <br />of the construction contract <br />nnff utility work will be completed in coordination <br />with the construction contract <br />M ruo railroad work required <br />Ent railroad work will be completed prior to the start of <br />the construction contract <br />nnlf the railroad work will be completed in coordination <br />with the construction contract <br />By <br />Previous Editions Obsolete <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.