My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA Skycorp 7142022
>
Meetings
>
2022
>
07. July
>
2022-07-19 10:00 AM - Commissioners' Agenda
>
PSA Skycorp 7142022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 1:23:33 PM
Creation date
7/14/2022 1:23:07 PM
Metadata
Fields
Template:
Meeting
Date
7/19/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
p
Item
Request to Approve a Professional Service Agreement with Skycorp LTD for Removal of County Owned Mobile Homes
Order
16
Placement
Consent Agenda
Row ID
91496
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />SCOPE OF WORK <br />In addition to providing all material and labor, the Contractor shall perform the following: <br />1. The Contractor is to remove 6 units listed below along with all accessory attachments <br />and <br />a) Unit 1 <br />b) Unit 14 <br />c) Unit 27 <br />d) Unit 29 <br />e) Unit 51 <br />f) Unit 53 <br />2. The County has turned off all water and power to these units, but the Contractor is <br />responsible for disconnecting all utilities from the units and marking the utilities per City <br />of Ellensburg requirements. <br />3. To the extent possible the Contractor is to recycle as much of the metal as possible. <br />4. Contractor is responsible for removing and disposing of all garbage and other materials <br />inside and outside or the units. <br />5. A Hazardous material assessment has been completed for all of the structures and all <br />identified materials will need to be removed in accordance with industry standards. <br />6. The Contractor is responsible for obtaining all necessary permits, licenses, and <br />insurance, and ensuring all related regulatory compliance under Federal and State law, <br />including those specific requirements of the Washington Department of Labor and <br />Industries, City and County. <br />Professional Services Agreement (rev. 09/24/2018) <br />Page 13 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.