Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF WORK <br />In addition to providing all material and labor, the Contractor shall perform the following: <br />1. The Contractor is to remove 6 units listed below along with all accessory attachments <br />and <br />a) Unit 1 <br />b) Unit 14 <br />c) Unit 27 <br />d) Unit 29 <br />e) Unit 51 <br />f) Unit 53 <br />2. The County has turned off all water and power to these units, but the Contractor is <br />responsible for disconnecting all utilities from the units and marking the utilities per City <br />of Ellensburg requirements. <br />3. To the extent possible the Contractor is to recycle as much of the metal as possible. <br />4. Contractor is responsible for removing and disposing of all garbage and other materials <br />inside and outside or the units. <br />5. A Hazardous material assessment has been completed for all of the structures and all <br />identified materials will need to be removed in accordance with industry standards. <br />6. The Contractor is responsible for obtaining all necessary permits, licenses, and <br />insurance, and ensuring all related regulatory compliance under Federal and State law, <br />including those specific requirements of the Washington Department of Labor and <br />Industries, City and County. <br />Professional Services Agreement (rev. 09/24/2018) <br />Page 13 of 18 <br />