My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-23-minutes-public-works-study-session
>
Meetings
>
2022
>
06. June
>
2022-06-07 10:00 AM - Commissioners' Agenda
>
2022-05-23-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 12:25:44 PM
Creation date
6/2/2022 12:24:14 PM
Metadata
Fields
Template:
Meeting
Date
6/7/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
90166
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
federally backed flood insurance and for Kittitas County to be eligible for flood disaster <br />relief. <br />On May 13, 2022, Ecology provided Kittitas County with a letter documenting the <br />current status of the CAV. <br />DISCUSSION: <br />Ecology staff conducted a floodplain tour, which included a review of aerial photography <br />to identify new structures within the floodplain. From this review, four (4) unpermitted <br />structures were identified. These structures have been referred to code enforcement and <br />will need to either be shown to meet county code requirements or removed in order for <br />the County to complete the CAV. Two other items identified, obtaining a Final Elevation <br />Certificate for a permitted structure, and permitting storage of materials in the floodplain <br />should be straight -forward to address. <br />The most challenging item on the CAV report to resolve will be the compliance issues <br />identified with the Fire District No. 7 station on Chepoda Road in upper Kittitas County. <br />Kittitas County has a meeting scheduled to discuss these issues with Ecology and FEMA <br />on June 15, 2022. Staff has also submitted a request for assistance from the Prosecutor's <br />Office. <br />The CAV letter also identifies that further engineering analysis is required for the <br />McElroy Road bridge. The Flood Control Zone District has committed to conducting <br />hydraulic analysis with Flood Control Assistance Account Program (FCAPP) funding. <br />Kittitas County staff will coordinate closely with Ecology and FEMA staff on this effort. <br />FISCAL IMPACTS: <br />Not currently known due to uncertainty about requirements to address Fire District No. 7 <br />compliance issues. <br />ATTACHMENTS: <br />Exhibit 1: Department of Ecology Letter Dated May 13, 2022 <br />Page 2 of 3 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.