Laserfiche WebLink
Initial Sign Installation Locations: <br />1. SR 821 mile post 10 <br />2. Teanaway Junction <br />Second Round of Sign Installation Locations: <br />1. Memorial/Fireman Park — Cie Elum <br />2. SR 821 mile post 8 <br />3. King Horn Slough-Hundley Rd. <br />Final specifications and maintenance agreement are being developed to meet the request of <br />WSDOT for installation of the signs. Signs at the initial location will be installed in each <br />direction of travel along the roadway. <br />FISCAL IMPACTS: <br />Costs for initial sign fabrication and installation is included in Public Works annual <br />budget. Funding for fabrication and installation of additional locations would need to be <br />considered. <br />ATTACHMENTS: <br />Exhibit 1: Water Trail Wayfinding Sign Design <br />Exhibit 2: Existing and Proposed Public Access Sites <br />Exhibit 3: Yakima River Mile 83, Mile Post 10 Site Map <br />Page 2 of 5 <br />Public Works "Work Session Staff Report" 2022 <br />