Laserfiche WebLink
APPENDIX ll: PRELIMINARY AIRPORT ASSESSMENT <br />AIRPORT OVERVIEW <br />G. PLANN|NG, MANAGEMENT, AND COMPLTANCE DOCUMENTS (PMCD) <br />Table 3: Bowers Field PMCDs <br />Airpoft Strategic <br />Business Plan <br />(ASBP) <br />Articulates the mission, vision, and goals for <br />the Airport; sets forth the objectives for <br />achieving goals; identifies the action plans for <br />accomplishing objectives; esfab/ishes the <br />parameters for checking progress; and <br />provides fhe basls for adiusting. <br />ELN currently does not <br />have an ASBP. This <br />project is for the purpose <br />of developing an ASBP <br />and will be completed in <br />2021. <br />Airport Master <br />Plan (AMP) <br />Assesses the current capacity of the Airport's <br />i nf ra stru ct u re, ev a I u ate s c u rre nt a n d p roj ecte d <br />demand, identifies existing and anticipated <br />deficiencies, and outlines fhe shoft, medium, <br />and long-term development goals for the <br />Airpoft. Typically, an airpoft master plan has a <br />time horizon of 20 vears. <br />ELN's AMP was updated <br />in2017. An Airport Layout <br />Plan (ALP) update was <br />completed in 2018. <br />LeasinglRents <br />and Fees Policy <br />(LRFC) <br />Sefs forfh the parameters for leasing Airport <br />land and improvements and outlines the <br />process for establishing and adjusting rents <br />and fees at the Airport. <br />ELN currently is in the <br />process of developing a <br />LRFC and it will be <br />completed in 2021. <br />Minimum <br />Standards (MS) <br />Esfab/lshes the minimum requirements that need <br />to be met by an entity as a condition for <br />conducting commercial general aviation <br />aeronautical activities at the Airport. <br />ELN is in the process of <br />updating the MS and it <br />will be completed in2021 <br />Rules and <br />Regulations (RR) <br />Sefs forfh the rules and regulations for the <br />safe, orderly, and efficient operation and use <br />of the Airpoft. <br />ELN currently is in the <br />process of developing <br />the RR and it will be <br />completed in 2021. <br />Development <br />Standards (DS) <br />Sets forfh the parameters goveming the design, <br />development, and/or modification of Airport <br />imprcvements. <br />ELN currently is in the <br />process of developing <br />the DS and it will be <br />completed in 2021. <br />DESCRIPTIONS CURRENT DOCUMENTSPMCD <br />Airport Strategic Business Plan, 0712612021 28