Laserfiche WebLink
Aftk <br />w7Washington State <br />A#p Department of Wansportation <br />Aviation Division <br />A Steward for Washington's Aviation System" <br />Airport Aid Application <br />Project Data Sheet <br />Complete a separate Project Data Sheet for each project listed from the Airport Aid Application (Form 900-030EF) <br />Kittitas County - Bowers Field (ELN) - Project No. 1 - Wetland and Stream Mitigation Project (Design) <br />1 Project Category (Select One Only): <br />® Pavement ® Safety (DPlanning ® Security ® Runway Safety 0 Equipment iO Maintenance © Property ® Other <br />® Master Plan / Airport Layout Plan <br />® Airport Layout Plan (ALP) Update <br />® Environmental <br />® Wildlife <br />17 Other <br />2 Detailed Project Description / Approach to Accomplishing Project: <br />Wetland and stream mitigation project (design phase). <br />The project includes design and bidding services. <br />3 Project Justification: <br />The Wetland and Stream Mitigation Design Project is needed to address federal environmental (NEPA) <br />requirements associated with upcoming Airport Improvement Projects at Bowers Field Airport. This project <br />will design for mitigation related to stream and wetland impacts associated with construction of forthcoming <br />airport improvements. The need for this mitigation was established during an Environmental Assessment <br />(EA). <br />4 Cost Estimate Details: Source of Project Cost Estimate - Negotiated Consultant Fee <br />Airport Admin Costs (IFEs, Advertising, etc) = $5,000 <br />Consultant Fees = $195,000 <br />TOTAL PROJECT COST =$200,000 (Amount eligible for WSDOT match funding) <br />5 Project Schedule: <br />Expected Start of Project: 9/1/2022 Expected Completion of Project: 3/1/2023 <br />Start of Work Covered by Grant: 9/1/2022 Completion of Work Covered by Grant: 3/1/2023 <br />Submit a detailed proiect schedule (to include project milestones). Submitting project schedule via: Emailing - Electronic Document <br />6 Other Supporting project documentation (Required): <br />Submit a spending plan identifying anticipated grant expenditures by month. Submitting via: Emailing - Electronic Document <br />Submit job creation data using the Aviation Economic Impact Calculator. Submitting via: Emailing - Electronic Document <br />7 Other Supporting project documentation (As Applicable): <br />Submit documentation supporting your consultant selection process. Submitting via: Emailing - Electronic Document <br />Submit a copy of your consultant's Scope of Work. Submitting via: Emailing - Electronic Document <br />Have project plans and specifications been prepared? E]Yes F/JNo <br />Has a property appraisal been completed for property acquisition? Yes ®✓ No <br />FAA AIP Project Number: 3-53-0026-XXX-XXXX <br />FAA Grant Contract Number: <br />Other supporting documentation? <br />DOT Form 900-030A EF <br />Revised 4/2021 <br />SCID Priority Score <br />(WSDOT Use Only) <br />