Laserfiche WebLink
APPENDIX II: PRELIMINARY AIRPORT ASSESSMENT <br />AIRPORT OVERVIEW <br /> <br />Airport Strategic Business Plan, 07/26/2021 35 <br />Figure 8 represents the location of each Industrial Park Tenant. <br />Figure 8 Industrial Park Tenants Park Airport Tenants  <br /> <br />Figure 9 represents the vacant land at the industrial park. <br />Figure 9: Industrial Park Vacant Land   <br /> <br /> <br />It is significant to note that the Industrial Park brings economic and job growth to the <br />community. Currently, the Airport has approximately 60 acres of land available at the <br />Industrial Park. <br />KITTCOM <br />Precision AG <br />Repair <br />FISH <br />Community <br />Food Bank <br />Airport Safe <br />Storage <br />Black Bird <br />Wraps and <br />Vinyl <br />Central <br />Washington <br />Property <br />Restoration <br />1201 Bagels <br />CWU <br />Training <br />Center <br />Emery <br />Construction <br />Ellensburg <br />Pallet