Laserfiche WebLink
5 gz,ess.zoS 108,249.6G786.605S ros,gsr.eoS z,zaq.szS z:,srz.soS 10,116.3395.55sS 1,638.1sS r,sag,roS 1,101.70S :so.ooS rsq.ooS 3s4.oo$ :so.ooS 4s2.ooS 47o.oo5 469.00$ +ss.ooS 479.00S 479.00S 479.00S Ez,sat.ts5 139,134.4sS +oa.osS 126,s63.10S 976.9ss 22,786.40S 9,814,3s78.75sS r,ez+.so5 t,ztt.soS +ss.ooS rss.ooS +ss.ooS rgs.ooS 4ss.ooS 19s.ooS +ss.oos 37s.00S 475.00S 475.00S 47s.oos 23.284.20Total CostS 31,250.41s 104,029.765 nq.u5 104.340,02Total CostS z,rse.srs 10,02s.7690.49sTotal Cost5 1,648.27S 1,397.G6Total CostS 1.108.49S 454.94Unit CostS Mt.qzS 340.20s 374.225 nq.zzunit costS 430.92S as+.9+S +go.szUnit CostS 481.95s 481.9sPavementCENTERLINE STRIPE4" YELLOW.'NO PASSING ZONE"4'' YELLOWCENTERLINE4'' WHITEEDGE & TURN LANES4" WHITEPavement Markings4" YELLOW (SKtp) CENTERLINE STR|pE''NO PASSING ZONE''4" YELLOW (SOL|4" WHTTE {SOL|D) EDGE & TURN LANES4'' WHITE SKIPPavement"NO PASSING ZONE"4,'YELLOWEDGE &ruRN LANES4" WHITEPavementI unit cost4 YELLOW (SOL|D) "NO PASSING ZONE'I s +erssUnitMIMIMIMIUnitMIMIMIMIUnitMIMIUnitMIQuantiW212.0530s.792.07278.82quantiw5.0150.0827.570.2rQuantiw3.422.9Quantitv2.3SCHEDULE AItem #Total CostUnit CostBidder 1ENGINEERS ESTIMATEPAVEMENTTotal Costgiddm 2STRIPERITEUnit CostBIDTABS2022 ANNUAT PAINTSTRIPE PROJECT1234SCHEDUTE BOF ETLENSBItem #Total CostUnit CostTotal CostUnit Cost5678SCHEDULE C (CtW OFItem #Total Costunit costTotal CostUnit Cost910SCHEDULE DoF souTH crE ELUM)Item #Total CostUnit CostTotal CostUnit Cost11EDGE & TURN LANES4" WHITEPROJECT BID:70sssMI2.3t2S +gr.gsSTRIPERITE479.@SPECIAIIZED PAVEMENT475.00Engineer Est.28r,230.07s267EstimatedBids hdgl beeo revievred fgrcdracy, unbalancingt /A.---- t'1*-=ofbid ilems.Tabulations have been ctrecked ard confrmed.3/zsfz"zz