My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2022-075
>
Meetings
>
2022
>
03. March
>
2022-03-15 10:00 AM - Commissioners' Agenda
>
Res-2022-075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 11:59:16 AM
Creation date
3/18/2022 11:59:06 AM
Metadata
Fields
Template:
Meeting
Date
3/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
q
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Watershed Sciences and Engineering Task Order No. 4 – Easton Reach Yakima River Hazard Analysis and Mapping Investigation
Order
17
Placement
Consent Agenda
Row ID
87183
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*+WATERSHED <br />SCIENCE & ENGINEERING <br />Estimate of Professional Services <br />Prepared for: Kittitas County <br />Project: Easton Reach Yakima River506 2nd Ave, Suite 2700 <br />Seattle, WA 98104 <br />Tel. (205)521-3000 <br />Hazard Mapping Study <br />March7,2022 <br />Jeff Johnson, Chris Frel, Dan Scott <br />Date: <br />Prepared By: <br />rASK DESCRIPTION <br />Hou6 <br />Totalssr. geom.tsno,Jr, Eno <br />1.2 LiDAR ToDooraohic Dala collection E <br />1.3 Prolect Krcl(-On l4eelrnq And General Fielcl Reconnaissance E $5 071 <br />1.4 Fteto tnvesltoaton 2 50 $12.774 <br />1 5 Channel Suruev 80 <br />Silbthlt 0 20 68 148 <br />2 Hyorolooy. Hvdnulrcs. and Geomorpholoqv <br />2.1 Hydrolooy 4 20 4.47Q2.2 HydraulicModeling 4 4 36 120 60 1 26,699 <br />36 7 670 <br />2.4 tsfldOe HVdraultc tsvalualon 24 5741 <br />2.5 GeomorphicAssessment 4 100 60 I 20.428 <br />2.6 Technicel Reoorl 40 <br />Subtolt 240 <br />3.1 Meeting with County Slalf lo Review lnvestiqation Resulls E '12 12 <br />3.2 Communitv lt/leetino 16 <br />2 6 1 723 <br />4 LOMR ComDilation and Submittal <br />4.1 LOMR llocumentation 60 40 20 681 <br />4.2 IEMA Submftal and goordrnalDn 4 30 24 12 573 <br />4 3 LOMR TeskAdminiskalidn <br />120 <br />fotal Hours and Direcl Labor Cost (DL) <br />-abor Rate ($/hr, July 2021 WSDOT OH 150.07%, 30% protit on DL) <br />rOTAL LABOR COST $15,754 $1,454 $38,038 $32,880 $62,300 <br />256.O <br />Direct Detail <br />Cost <br />It ilsage <br />Lodging and Per Diem Field Data Collection <br />Suruey Equipment Renlal <br />L|DAR and Base Map (GeoTerra) <br />3% Markup on Subconsultant <br />3,000 <br />2,500 <br />45,000 <br />1,350 <br />1000 $0.s85 <br />Total $52,i|35 <br />$ <br />$Tolal Direcl Expenses <br />Total Labor <br />Total $215,281 <br />192,826 <br />52,435
The URL can be used to link to this page
Your browser does not support the video tag.