My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_WSE TO4_Easton
>
Meetings
>
2022
>
03. March
>
2022-03-15 10:00 AM - Commissioners' Agenda
>
Resolution_WSE TO4_Easton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 1:48:36 PM
Creation date
3/10/2022 1:47:14 PM
Metadata
Fields
Template:
Meeting
Date
3/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
q
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Watershed Sciences and Engineering Task Order No. 4 – Easton Reach Yakima River Hazard Analysis and Mapping Investigation
Order
17
Placement
Consent Agenda
Row ID
87183
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimate of Professional Services <br />Prepared for: Kittitas County <br />506 2nd Ave, Suite 2700 Project: Easton Reach Yakima River <br />Seattle, WA 98104 Hazard Mapping Study <br />Tel. (206)521-3000 Date: <br />Prepared By:Jeff Johnson, Chris Frei, Dan Scott <br /> Hours <br />TASK DESCRIPTION Principal Sr. Eng. 1 Sr. Eng. II Sr. Geom. Eng. Jr. Eng Totals <br />1 Data Collection and Field Reconnaissance <br />1.1 Background Data Collection and Review 2 4 8 12 3,652$ <br />1.2 LiDAR Topographic Data Collection 2 2 8 1,559$ <br />1.3 Project Kick-Off Meeting and General Field Reconnaissance 8 8 8 8 5,074$ <br />1.4 Field Investigation 2 2 50 40 12,778$ <br />1.5 Channel Survey 2 4 80 60 15,550$ <br />Subtotal 14 0 20 68 148 60 38,613$ <br />2 Hydrology, Hydraulics, and Geomorphology <br />2.1 Hydrology 4 8 20 4,470$ <br />2.2 Hydraulic Modeling 4 4 36 120 60 26,699$ <br />2.3 Analysis and Review of Model Results 4 16 36 7,670$ <br />2.4 Bridge Hydraulic Evaluation 8 8 24 5,741$ <br />2.5 Geomorphic Assessment 4 100 60 20,828$ <br />2.6 Technical Report 16 4 24 32 40 17,370$ <br />Subtotal 40 8 92 132 240 120 82,778$ <br />3 Meetings and Administration <br />3.1 Meeting with County Staff to Review Investigation Results 8 12 12 12 6,802$ <br />3.2 Community Meeting 2 8 8 16 4,788$ <br />3.3 Administration 4 16 2 2 8 4,723$ <br />3.4 Administrative Reserve 20,000$ <br />Subtotal 14 0 36 22 30 8 36,314$ <br />4 LOMR Compilation and Submittal <br />4.1 LOMR Documentation 6 40 80 40 20,681$ <br />4.2 FEMA Submittal and Coordination 4 30 40 24 12,573$ <br />4.3 LOMR Task Administration 8 6 1,867$ <br />Subtotal 10 0 78 0 120 70 35,121$ <br />Total Hours and Direct Labor Cost (DL) 78.0 8.0 226.0 222.0 538.0 258.0 <br />Labor Rate ($/hr, July 2021 WSDOT OH 150.07%, 30% profit on DL) $201.97 $181.78 $168.31 $148.11 $115.80 $86.82 <br />TOTAL LABOR COST $15,754 $1,454 $38,038 $32,880 $62,300 $22,400 192,826$ <br />Direct Expense Detail <br />Units Rate Cost <br />Mileage 1000 $0.585 585$ <br />Lodging and Per Diem Field Data Collection 3,000$ <br />Survey Equipment Rental 2,500$ <br />LiDAR and Base Map (GeoTerra)45,000$ <br />3% Markup on Subconsultant 1,350$ <br />Total 52,435$ <br />Cost Summary <br />Total Labor 192,826$ <br />Total Direct Expenses 52,435$ <br />Total 245,261$ <br />March 7, 2022
The URL can be used to link to this page
Your browser does not support the video tag.