My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2022-069
>
Meetings
>
2022
>
03. March
>
2022-03-01 10:00 AM - Commissioners' Agenda
>
Res-2022-069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 11:20:24 AM
Creation date
3/8/2022 11:20:19 AM
Metadata
Fields
Template:
Meeting
Date
3/1/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the North Thorp Highway-Yakima River Bridge CRP 302-20
Order
16
Placement
Consent Agenda
Row ID
86539
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County Public Works <br />Project Title <br />N. Thorp Hwy-Yakima River Bridge <br />Date <br />2/U2022 <br />Right of Way <br />No Right of Way Needed <br />* All construction required by the <br />contract can be accomplished <br />within the exiting right of way. <br />{I night of Way Needed <br />E ruo Relocation ! Relocation Required <br />Utilities Railroad <br />E ruo utility work required <br />{All utility work will be completed prior to the start <br />of the construction contract <br />Erut utility work will be completed in coordination <br />with the construction contract <br />{No railroad work required <br />Enlt railroad work will be completed prior to the start of <br />the construction contract <br />nrut the railroad work will be completed in coordination <br />with the construction contract <br />Description of Utility Relocation orAdjustments and Existing Major Shuctures lnvolved in the Project <br />If utilities are identified to be in conflict with the scope of work, they will be temporarily relocated prior to <br />construction by the utility owners. <br />FM lnvolvement <br />ls any airport located within 3.2 kilometers (2 miles) of the proposed project? ! Ves Z ruo <br />Remarks <br />This project has been reviewed by the legislative body of the administration agency or agencies, or it's <br />designee, and is not inconsistent with the agency's ve plan commu nity development. <br />Agency Kittitas <br />Date 3/ r /eaaa <br />DOT Form 140-101 <br />Revised 0412015 <br />By <br />Previous Editions Obsolete <br />for <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.