Laserfiche WebLink
2022 Maintenance Rock Materials <br />Bid Opening February 17,2022, at 2:00 p.m. <br />SCHEDULE'B' <br />Vendorto Provide Labor and Equipment to Load Materials <br />1 14,000 Ellensburg BST Crushed Surfacing 1/2 to No. 4 <br />Ellensburg Cement Products <br />$12.00 $168 <br />2 3,000 East Kittitas BST Crushed Surfacins 1/2 to No. 4 $12.00 $36,000.00 <br />3 5,000 Cle Elum BST Crushed Surfacing 1/2 to No. 4 $12.00 $60,000.00 <br />4 3,500 Ellensburg BST Crushed Surfacing 3/8 to No. 10 $15.25 $53,375.00 <br />5 1,600 Cle Elum BST Crushed Surfacing 3/8 to No. 10 $15.25 $24,400.00 <br />6 4,000 Ellensburg Maintenance Sand $10.30 $41,200.00 <br />7 4,000 Cle Elum Maintenance Sand $10.30 $41,200.00 <br />I 1,000 Ellensburg <br />1 1/4" Crushed Surfacing Base <br />Course $9.25 $9,250.00 <br />9 1,000 Cle Elum <br />1 114" Crushed Surfacing Base <br />Course $9.25 $9,250.00 <br />10 2,000 Ellensburg 5/8" Crushed Surfacing Top Course $9.35 $18,700.00 <br />11 2,000 Cle Elum 5/S" Crushed Surfacing Top Course $9.35 $18,700.00 <br />12 1,000 Ellensburg 2ll2" Ballasl $9.25 $9,250.00 <br />13 1,000 Cle Elum 2112" Ballasl $9.25 $9,250.00 <br />Sub-total before Tax -$498,575.00 <br />SALES TAX -8.00%$39,886.00 <br />Total Schedule "B" -$538,461.00 <br />SCHEDULE ''B''