Laserfiche WebLink
Inter ernmental ement <br />o Devices dedicated to the program such as agency & VHF radios <br />o Radar units <br />o Sirens <br />o Blue lighting equipment <br />o Hailers <br />o Global positioning system (GPS) units <br />o Personal breath testers (PBT) <br />o Cell phones used 100% RBS only, or prorated for a percentage of time used on <br />boat <br />o Battery chargers and computers dedicated to program use <br />o lncludes brackets and fittings for installation and use <br />r Fluids for hydraulic system <br />. Fuel, fuel additives and filters; associated disposalfees <br />. Gear oil for lower units <br />. Glass replacement and costs to install, associated disposal fees <br />. Grease and lubricants <br />r Oil and oilfilters; associated disposalfees <br />. Parts and labor for regular scheduled maintenance and scheduled replacement <br />o Parts for replacement on the vessel when failure occurs or when damaged and labor, <br />which includes engine, lower unit and cooling system repairs and replacement <br />r Vessel canvas tops and side covers; includes repairs and replacement of <br />canvas/vinyl/plastic material and framing structures <br />Vessel hull and structural repairs/replacement of railings, pilot house, decks, cleats, <br />ladders, swim platforms, Sampson posts, fittings, towing equipment, davits, anchors, <br />chain, and associated hardware and fittings <br />a <br />ASSOCIATED EOUIPM FOR PATROL VESSELS <br />a Cost of emergency response and rescue equipment repair, replacement and <br />maintenance, including: stretchers, first aid/first responder kits and materials, fire <br />suppression equipment and supplies. <br />Cost of fees related to cell phone charges, annual registration charges, renewal fees, <br />and insurance are prorated for percentage of time used performing RBS missions. <br />Cost of haul-outs and associated costs with cleaning and maintenance of hull, fixtures <br />and drive systems, and associated disposalfees. <br />Costs related to moorage, including cost of water/electricity associated with maintenance <br />and moorage. <br />a <br />a <br />a <br />Page 42of 64