My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-22-minutes-solid-waste-study-session-
>
Meetings
>
2022
>
03. March
>
2022-03-01 10:00 AM - Commissioners' Agenda
>
2022-02-22-minutes-solid-waste-study-session-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 2:15:36 PM
Creation date
2/24/2022 2:15:00 PM
Metadata
Fields
Template:
Meeting
Date
3/1/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
86539
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County IGA Proposal <br />iii. Provide an Energy Services Proposal (ESP) that will include a project schedule, scope, <br />Guaranteed Maximum Pricing and Energy Savings for implementation in 2022. <br />The investment grade effort is intended to lead to the implementation of facility improvement measures. The <br />audit will provide all details necessary for implementation of viable initiatives including preliminary design, cost, <br />construction schedule and energy savings. <br />The ESP/IGA will be a product of the direction McKinstry receives, and it is anticipated that the information <br />contained in the IGA and resulting Energy Services Proposal will form the basis of a proposal and contracting <br />documents. The specific deliverables associated with this professional services endeavor can be found in <br />Attachment A. <br />TIMELINE AND MILESTONES <br />McKinstry will initiate this scope of work upon receipt of written direction from Kittitas County. Formal progress <br />review meetings will be conducted regularly throughout the study phase. During these review meetings, <br />McKinstry will recommend measures based on preliminary analysis. The goal of these review meetings is to <br />focus engineering efforts, budgeting, and savings assessment on those measures that possess a high probability <br />for implementation. During this time, McKinstry will provide a detailed measurement and verification (M&V) <br />plan for the energy savings. <br />McKinstry will target completion of the Investment Grade Audit within 90 days upon a signed contract from <br />Kittitas County. <br />REQUESTED INFORMATION <br />For effective execution of this proposal, we ask that Kittitas County provide access to the following: <br />1. Historical utility bills and steam consumption for the last 24 to 36 months. <br />2. All mechanical, electrical, architectural, and structural drawings. <br />3. All operational and maintenance manuals, balancing records, & specifications. <br />4. Operational records related to the cost of maintaining specific equipment. <br />5. Information with regards to any on-going maintenance contracts. <br />6. Access to individuals that have relevant information pertaining to the day-to-day operation of <br />energy using systems on site. <br />7. Prior energy studies for related systems, if applicable. <br />8. Any available hazardous material survey reports (i.e. Good Faith Survey). <br />COST EFFECTIVENESS CRITERIA <br />It is Kittitas County's intent that McKinstry will implement all approved projects that meet the project cost <br />effectiveness criteria: <br />QY�try <br />CONFIDENTIAL & PROPRIETARY <br />IPonf lbur Building 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.