My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2022-047
>
Meetings
>
2022
>
02. February
>
2022-02-15 10:00 AM - Commissioners' Agenda
>
Res-2022-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:51:43 AM
Creation date
2/23/2022 11:51:19 AM
Metadata
Fields
Template:
Meeting
Date
2/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
n
Item
Request to Approve a Resolution for the 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Cle Elum
Order
14
Placement
Consent Agenda
Row ID
86034
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CLE ELUM <br />First Street Downtown Revitalization - Phase 3A Oakes Avenue to Pennsylvania Avenue <br />Englneer's Estlmate <br />1111612021 <br />HLA Project No. 21010G <br />Itom <br />No.De8cription Payment <br />Specification Unit Unlt Cost Overall <br />Quantity Ovorell Cost <br />10r (;hanoe 1-(M.4{'tl FA 1 $10.000.oo,SPCC Plan t-07 lSal)LS $500 00 1 $500.o0 <br />3 Mlobilization 1-09 7 LS o o00 00 $40.000.00 <br />4 Proiecl Temoorarv Traffic Control 't -10.5 LS o00 00 $20.000.00 <br />Removal of Slructures and Obstructions 2-O2.5 LS $10.000.00 <br />Unclassified Exc€vation lncl. Haul 2-03.5 CY 460 s?? 600 00 <br />Crushed Eurfacinq Base Course 4-M.5 TON ss 300 00 <br />{Crushed Surfecino Tob Course a.04 5 TON sl 200 00 <br />HMA Ct. 1i2-tnch PG 64H-28 5-04 5 TON 55 $'t3.750.O0 <br />10 Curb lnlet Frame 7-05 5 EA 2 $2.800.o0 <br />1'l Adiust Catch Basin 7-05 5 FA s600 00 2 $1.200.o0 <br />12 elec{ Backfill. as Direc'ted 7-O8.5 CY 50 $2.500.00 <br />13 0.1. PiDe for Waier Main 6 ln. Diam.7-09.5 LF ,$600.00 <br />14 Adiusl Valve Box 7-12.5 EA t $1.000.00 <br />I Hydrant As8embly with TaDoino Valve Assemblv 7-12.5 EA 1 $6.000.00 <br />lrrioation Svslem. Comblele 7-16.5 LS 1 sl8 500 00 <br />17 ESC L€ed 8-01.5 DAY 6 $900 00 <br />1E lnlet Protdclion 8-01.5 EA $560.O0 <br />Plant Soloc'lion - R6dDcinl€ MaDle (2-'l12" Celimrl 8.O2 5 EA s3.200.oo <br />Plant Selection - Metro Gold Maole {2-112" Calioer)8-02 5 FA 6 $4.800.o0 <br />1 tlant Seleclion - Kelsevi Door lood 12 Gallon)8-02.5 EA s60 00 6:s3.720.00,?)lant Selection - Dwarf Muoo Pine (2 Gallon)8.02 5 EA 1 $780.00 <br />23 tlant Sel€ction - Black Eved Susan 11 Gallon)8-02.5 EA 192 $5.760.00 <br />2l 'lanl Selection - Woods ComDact Kinnikinnick (2 Gallon)8-02.5 EA )t $7.140.00 <br />,lant S€lection - Gold€n Nuooet Barberrv (2 Gallon)8-02_5 EA 3g s2 340 0n <br />'lant S€l8ction. Flofl€r Carpet Pink Rose (2 Gallon)E-02_5 EA 24 s1 4r'0 00 <br />27 Plant S€lection - Sun Ross Burqundv Dazer (1 Gallon)E-02.5 EA 63 $2.205.00 <br />2A Plant Seleclion - Moonbeem CormDsis a l Gellonl 8-02.5 EA 90 $3 150 00 <br />29 Tooscil TvDe A a-o2 5 CY I s8.400.o0 <br />Suborede Toosoil 8-O? 5 CY 't7 $14_000.o0 <br />Rool Eanier 8-O2 5 IF fl70 s20.100.00 <br />Root Path <br />Basalt Rock Mulch <br />8-02.5 <br />-ErtE- <br />LF-----.E- <br />34 Plant Establishmcnt 8-02.5 FA I O00 00 $1.000.00 <br />35 )ement Conc. Traffic Curb and Gutter 6-(M.5 LF $30.250.00 <br />Bench a-05.5 EA 1 s3.500.00 <br />3 Trash Receptacle a-05.5 EA 3.500.00 1 $3.500,00 <br />onument Relocetion 6.05.5 FA 2.500.00 1 $2 500 00 <br />39 ;ement Conc. Sideurelk 6Jnch Thick a-ld 5 SY $6 800 00 <br />40 )ement Conc. Side$alk 4-lnch Thick Prtterne.i a-td 5 -sY $76.950.OO <br />)ement Conc. Curb Remb 8-la 5 FA 3 5 $10_000.o0 <br />42 '€e Liohlino Svstem. Comblele 8-20 5 ts 1 $30_000.o0 <br />Spare Conduil 1 ln, Diam. (Speakor Wire) <br />Conduit lnstallation (PSE llluminationi <br />8-20.5 <br />-:tdr <br />LF 5 $30.00 <br />s12.360.00 <br />A5 P€rmanent Sionino 8-21.5 LS 4 000 00 $4.000.00!6 Pav6ment Markinos a-22.5 LS s8.000 00 $8.000.00 <br />Assumolions:'1. lncludes NE bulbout at First St.oet and Oake6 Ave inlersec{ion and <br />north sidewalk from Oakes Ave lo Pennsylvanla Ave-2. Design engineering includes new specifcations, conkact <br />document8, and repackaged plans lor reduced project limits from <br />original Phsse 3 "shov€l ready" plans, to be combined wilh secured <br />funding for Phase 3A - Billings Avo to Oakes Ave.3. Eiectrical, illumination, and drainage extensions ot Phase 2 syElems <br />(using temporary existing illumination service, etc.).4. New irrigation point of conn€c{ion near north midblock.5. Newcrosswalk on north leg of Firsl Slreet and OakesAve only. <br />Subtotal <br />Contingency 1070 <br />llluminalion Systom (PSE) <br />Eetlmated Construction Co3t <br />$460,235.00 <br />$45,000.00 <br />$5s,000.00 <br />$s61,235,00 <br />WSDOT CN Fees <br />Design Engineering and Bidding Services <br />Construction Engineering 1 5% <br />$2,500.00 <br />$83, I 00.00 <br />$84,200.00 <br />Total Estlmated ProJect Cost $73'1,035.00 <br />G:\PROJECTS\2021u1010Gu022 Kiltilas Dlstressed County 0.09\Cost EEtirnsle - Firsl Streel Ph 3A Downtown Re{,italiration.xtsx
The URL can be used to link to this page
Your browser does not support the video tag.