Laserfiche WebLink
Level of Service Anolysis <br />Levels of service for stormwoter copilol focilities usuolly lry to meet woter quality stondords, runoff, ond <br />erosion control requirements of the opplicoble Stormwoter Monogement Monuol for Eostern Woshington. <br />Chopter 13.'l 5 of ihe Roslyn Municipol Code governs stormwqter requirements for development. <br />Requirements include o mondote thot ony new development creoting more thon 5,000 squore feet of <br />impervious surfoces hqve o stormwqter droinoge plon. <br />Plonned Projects, Costs, ond Revenue <br />Stormwoter copitol proiects included in the City's 2017-2023 CopitolFocilities Plon ore listed in Exhibit <br />3r8, ond mstch the proiects recommended in the City's 2014 Stormwqter Comprehensive Plon. <br />Exhibit 3-8. Plonned Slormwqler Proiech, 2Ol7-ZOZ} <br />CIP lr Pennsylvoniq Ploce Bottleneck <br />CIP 2: South A Street Culvert <br />CIP 3r North B Street Heodwoll <br />CIP 4' North l,t Street Heodwoll <br />CIP 5: North C Sffeet Heodwoll <br />CIP 6r Reroute North 3'd Street <br />CIP 7A: Storm Sewer Trunk Llne, South of Montqno <br />CIP 7Br Storm Sewer Trunk Line, South of Montono - <br />Porollel Pipe <br />CIP 8: Siorm Trunk Line, Monfonq to Pennsylvonio <br />CIP 9: Hoffmonville Conveyonce <br />CIP l0; North I't Street, Woshirrgfon to Nevodo <br />CIP I |: Crystol Creek Restorotion ond Wetlqnd <br />Creqtion Demonstrotion Proiect <br />Source: City of Roslyn 2017-2023 Copliol Fociliries plon <br />2017 <br />2017 <br />20r I <br />20r 8 <br />2A18 <br />20r I <br />20r 9 <br />2019 <br />2020 <br />2020 <br />2020 <br />2021 <br />$230,000 <br />$220,000 <br />$400,000 <br />$270,000 <br />$ t 90,000 <br />$930,000 <br />$ 1.720,000 <br />$i20,ooo <br />$4zo,ooo <br />$300,000 <br />$430,000 <br />$195,000 <br />The Stormwqter Plon includes o revenue onolysis with detqiled informotion on funding sources ond is <br />incorporoted by reference. The Plon recommended the City form o Slormwoier Utility ond levy o monrhly <br />utilify rote to fund stormwoter operotion, mqinienonce, ond q shore of copitol improvements, <br />ln 2016, the Roslyn City Councilcrested o Stormwoter Utllity to monoge ond regulote surfoce ond <br />stormwoter. (City of Roslyn, 20'16)A stormwoter utility fund wos creoted. ond in 2Ol7 the City begon <br />ossessing o siormwoler fee on properties in the city. (Roslyn Municipol Code, Chopter 13.13 ond 13.14) <br />Proiecl 5chedule Cost <br />;.lll City of Roslyn Comprehensive Plon Updore I Copitol Focilitjes plon | 't