My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2022-046
>
Meetings
>
2022
>
02. February
>
2022-02-15 10:00 AM - Commissioners' Agenda
>
Res-2022-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:51:08 AM
Creation date
2/23/2022 11:50:43 AM
Metadata
Fields
Template:
Meeting
Date
2/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution for the 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
13
Placement
Consent Agenda
Row ID
86034
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Project Site Description <br />3.1. Project Limits <br />The project site for the stormwater retrofit study area is intended to capture the urbanized areas <br />within the Stormwater Retrofit Study Area shown in Exhibit I and Exhibit 2. The project site is a <br />270'acre area of developed lands within the City that discharge to Crystal Creek, and consists of <br />commercial, residential, light industrial, public facilities and historic uses. The drainage subbasins <br />delineated in the Plan were carried fonrvard for this analysis. <br />The potential locations identified for stormwater retrofiis were reduced to exclude the restricted <br />buffer area per Policy H2.5 of the City of Roslyn, which specifies that "all lots within 300 feet of <br />wetlands shall be 50 acres or larger. No building or development is permitted within 300 feet of <br />wetlands." This area was further reduced to remove the unsewered areas of the City. The <br />resultant Treatment Assessment Area measures approximately 152 acres and is shown in <br />Exhlblt 2. <br />The CIP 1 Treatment Assessment Area is shown in the attached Exhlblt 2 as the urbanized <br />tributary area for the CIP 1 treatment project and measures approximately 45 acres. The CIP 1 <br />treatment project will advance design of the treatment facilities within the CIP 1 Treatment <br />Assessment Area. Final design and construction will be done under separate grant funding, The <br />CIP 1 Treatment Assessment Area drainage subbasins were subdivided into smaller subbasins to <br />aid in a more detailed analysis for design advancement and quantification of lhe water quality <br />benefit. <br />The drainage areas and existing impervious areas are listed in Appendix A for each subbasin <br />shown in Exhibit 2. <br />3.2. Project Site Conditions <br />The land use is predominantly urbanized, including commercial, residential, light indushial, and <br />historic uses from the City. The site generally slopes from northwest to southeast towards Crystal <br />Creek. There are significant elevation differences throughout the City. The tax parcels (and public <br />right-of-way) were obtained from the Kiftiias County COMPAS database. The topographic <br />contours were obtained from the Washington State L|DAR portal, Kittilas County FEMA Study <br />conducted in 2011 (https://lidaroortal.dnr.wa.qov/#47.23423:-120.99578:15). <br />There are wetlands to the west and southeast of the Treatment Assessment Area. Wetlands exist <br />south of Roslyn Pioneer Park, north of Writehead Road where Crystal Creek crosses the road, <br />and south of Writehead Road. The wetland boundaries and associated layers were obtained <br />from the Plan. <br />The soils within the project site are mostly Roslyn ashy sandy loam with a Hydrologic Soil Group <br />of B, and Teanaway ashy loam with a Hydrologic Soil Group of C. There are also some dumps <br />and mine sediment with a Hydrologic Soil Group of D according to the Gridded Soil Survey <br />(gSSURGO) Database. <br />The climate is heavily influenced by the adjacent mountain ranges and elevation, Precipitation is <br />higher in the winter than the summer. The Plan provides more details regarding average monthly <br />3
The URL can be used to link to this page
Your browser does not support the video tag.