Laserfiche WebLink
Legend <br />Q Approximate Test Plt Location <br />A swale lD <br />l; I Catchbasin <br />f*"'J nrea or Rotentiat Effect <br />ffi Biofittralion swates - ctp 1 <br />--)- Storm Pipe <br />lf, tots wifr Buildings Contributing to Historic Districl <br />\Abtlands <br />\ btlands Butfer <br />L2A.1 <br />t_24 <br />A1 5A1t <br />14 <br />L1:1 <br />L2 <br />L1.2 <br />N <br />A <br />200 300 4000 50 100 <br />Feet <br />Exhibit A - North CIP 1 Concept Design Map <br />loslyn CIP I Stormwater Treatment Project <br />IGN <br />F{g <br />Figure 3. The City of Roslyn Stormwater Retrofit Alternatives Analysis and CIP t <br />Treatment Design project area locations showing proposed biofiltration swales and <br />geotechnical test pits.