My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amend 2
>
Meetings
>
2022
>
02. February
>
2022-02-15 10:00 AM - Commissioners' Agenda
>
Amend 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:46:05 AM
Creation date
2/23/2022 11:45:33 AM
Metadata
Fields
Template:
Meeting
Date
2/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
d
Item
Request to Approve Amendment No. 2 to Contract HH-2020-002-HopeSource-CIP between HopeSource and Kittitas County
Order
4
Placement
Consent Agenda
Row ID
86034
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Pro Forma Single Family Rentals <br />change orders. rypi."r *ntini"-n;;;;;;; ;;;;;;;ir;;;.;;;;;;;;.;;;. ;;:[, ;;;; - <br />carefully the proiect has been evaluated and specifications identified, the lower the contingency amountneeded. <br />Soft Costs <br />'Architectural fees should be based on estimates from an architect. Fhese fees may be based on a certainpercentage ofthe consiluction contract amount, a fee per dwelling unit, a flat fee for services, or anotherbasis' with rental rehab projects, the specifications and cost estimates are often completed by a rehabspecialist, either a specialist on the developer's staff or a contracted specialist. Note that design andconstruction management costs could be So for budgeting purposes if the developer fee has been calculatedto pay for all project planning and management costs. <br />o The engineering fee should also include mechanical or structural engin€ering costs, if any, incurred as partof the design process. <br />o Environmental review costs could include the cost of a third-party contractor completing revie$/s requiredtodetermineclearance; thethird-partyreviewswouldneedtobeapprovedbythegranteeorother <br />"responsible entity". <br />' A survey prior to acquisition may or may not be required by NSP grantees for single-family programs. prior <br />to providing construction or permanent financing, it may be required by the mortgage lender. A survey canreveal easements that make sorne of the land unbuildable. <br />' As-is appraisals are required in NSP for foreclosed properties, to determine if the selling price is at least 1%above the market value. lt is a good practice to ask the appraiser or another entity to provide ,,comparable <br />rents" forthe housing units in completed condition, based on a transrnittal ofthe plans and specificationsorinspection of the unit{s) after the redevelopment is complete. The "rent comparables,' should be used toestablish the rents in the operating pro forma. <br />r Property/casualty insurance should be obtained by the developer for the interim pe riod before builder,s <br />l':111'_i_':,:::j:T"_'ll,_"-."I"3_ll:1"-1:_::':T'_':-:t:,,Esf.T::1,:_.ll::_1T::1"_y9H11"1111,i,"
The URL can be used to link to this page
Your browser does not support the video tag.