My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 1- HH-CIP- FE
>
Meetings
>
2022
>
02. February
>
2022-02-15 10:00 AM - Commissioners' Agenda
>
Amendment 1- HH-CIP- FE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 1:02:54 PM
Creation date
2/10/2022 1:01:14 PM
Metadata
Fields
Template:
Meeting
Date
2/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
d
Item
Request to Approve Amendment No. 2 to Contract HH-2020-002-HopeSource-CIP between HopeSource and Kittitas County
Order
4
Placement
Consent Agenda
Row ID
86034
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Pro Forma Single Family Rentalsv. rv..tr.ro!change orders' Typical contingency amounts for rental rehab projects are 10% to 15%. Typically, the morecarefully the project has been evaluated and specifications identified, the lower the contingency amountneeded.Soft Costsr Architecturalfees should be based on estimates from an architect. These fees may be based on a certainpercentage of the construction contract amount, a fee per dwelling unit, a flat fee for services, or anotherbasis. With rental rehab projects, the specifications and cost estimates are often completed by a rehabspecialist, either a specialist on the developer's staff or a contracted specialist. Note that design andconstruction management costs could be $o for budgeting purposes if the developer fee has been calculatedto pay for all project planning and management costs-' The engineering fee should also include mechanical or structural engineering costs, if any, incurred as partofthe design process.r Environmental review costs could include the cost of a third-party contractor completing reviews requiredto determine clearance; the third-pafi reviews would need to be approved by the grantee or other"responsible entity".r A survey prior to acquisition may or may not be required by NSP grantees for single-family programs. priorto providing construction or permanent financing, it may be required by the mortgage lender. A survey canreveal easements that make sorne of the land unbuildable.r As-is appraisals are required in NSP for foreclosed properties, to determine if the selling price is at least 1%above the market value. lt is a good practice to ask the appraiser or another entity to provide ,,comparablerents" for the housing units in completed condition, based on a transmittal of the plans and specifications orinspection of the unit(s) after the redevelopment is complete. The "rent comparables" should be used toestablish the rents in the operating pro forma.' Propertylcasualty insurance should be obtained by the developer for the interim period before builder'sr::y::::i:T::i:': ?IlT-l'_:1"-1,:::?t::l::,::ir:"",i:::1,:_T:l_l'i::53:y:l'n"*u,d obtain
The URL can be used to link to this page
Your browser does not support the video tag.