My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_PFacilitiesAgmt2022_City of Roslyn
>
Meetings
>
2022
>
02. February
>
2022-02-15 10:00 AM - Commissioners' Agenda
>
Resolution_PFacilitiesAgmt2022_City of Roslyn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 1:04:31 PM
Creation date
2/10/2022 1:01:02 PM
Metadata
Fields
Template:
Meeting
Date
2/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution for the 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
13
Placement
Consent Agenda
Row ID
86034
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Design Analysis <br />6.1 Existing Stormwater Drainage System <br />An existing hydrology and hydraulics XPSWMM model from the Plan was used for the analysis of <br />this study. Before using this model, various hydrological parameters ware reassessed and <br />updated to model the existing conditions of the drainage basins associated with this study. <br />Subbasins within the project site were modified to follow the topography of the City rather than <br />grouped tax parcels. In reassessing the subbasins, new flow paths were created for each <br />subbasin. Land uses within each subbasin were updated and used to calculate new Curve <br />Number (CN) values and new times of concentration (Tc). The resulting subbasin parameters can <br />be found in Appendix A <br />For the stormwater retrofits, the water quality design storm is based on the 6 -month, 3 -hour storm <br />event in accordance with the SWMMEW (Ecology, 2019). The resultant flow rates for each basin <br />can be found in Appendix B. <br />6.2. Proposed BMP Design and improvements <br />The preferred alternative includes the implementation of biofiltration swales and vegetated filter <br />strips for stormwater treatment in the Treatment Assessment Area. This option allows the <br />stormwater treatment facilities to be dispersed around the City, treating runoff as close to the <br />source as possible. Additionally, the preferred alternative provides the least amount of <br />disturbance to the historical integrity of the City by adhering to the historical preservation <br />guidelines of preserving sidewalks, fences, and trees when at all possible. These vegetated <br />facilities will be designed to be compatible with the climate and region. These facilities are <br />depicted in the following figures extracted from the SWMMEW (Ecology 2019): <br />MINIMAL IOMM <br />• rY. MlCIrJiChrdY iY!!eN <br />9:L�r,iv Wgea'tirY1i1G 4!'Itl•+r <br />C,[:r r9*I Iter YGni.•r: • <br />• E��R�am ll,aY,ae��eN ., k <br />iJ is <br />'v <br />clpcw! r41 yclr <br />Ivrewril Yrt I <br />JIII' n n In rNJ 7 <br />Rt•6a1'rpr Glr iwla• � � } <br />1e!nWb'i faNr]:ri'r <br />Bpwn f0 <br />Cnl eira ! <br />Gin goR+ll 1 <br />s.IRh di..kOr 11 <br />t] 11(ptil, ! <br />r <br />I <br />4 <br />-a <br />IhNi.Wacre <br />rh two, <br />xrnFiO ana tuOrnR ri J \ �— M9rr3N0 hrn aneEemay t,e, <br />wOgrrle trs l.pin ryr•al <br />e/loeat uneniw�+ <br />tiferNrs 0•.n p04rrc7, <br />FIGURE 1: Sior-ELTRATION SIAVALE <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.