Laserfiche WebLink
EXHIBIT ''A" <br />SCOPE OF WORK <br />ln addition to providing all material and labor, the Contractor shall perform the following <br />WW9o22 andatt work must be compteted by JS00rr,Contractor can start work <br />2022. <br />Contactor is to crush designated concrete pile located at the Kittitas County Ryegrass <br />Landfifl to a non-spec 1Tz" minus product removing as much metal as possible, metal is <br />to be hauled off by contractor. Crushed material approved by Kittitas County is to be used <br />to cover cells and build roads. <br />For an additional fee Contractor will prep all material over 2'x2'to and acceptable size so <br />it can be crushed to the non-spec 1Tz" minus product. <br />P rofessiona I Se rvices Ag reement (rev . 02126 I 20 17 ) <br />Page 13 of 17