Laserfiche WebLink
funding to the project in 2022. Moving rapidly to replace the load limited highly utilized <br />bridge is expected to limit risk the traveling public owing the high average daily traffic <br />count on Vantage Highway. Proceeding with complete federal procurement from design <br />through construction assures maximum grant compliance. <br />FISCAL IMPACTS: <br />Kachess Culvert replacement will continue being funded by PW Road Fund reserves. <br />ATTACHMENTS: <br />Exhibit 1: ADOPTED SIX YEAR PLAN <br />Page 2 of 3 <br />Public Works "Work Session Staff Report", 2021 <br />