Laserfiche WebLink
Kittitas County Capital lmprovement Program <br />2022-2027 Summary <br />The following table summarizes the2022-2027 Six-Year Plan. <br />December 7, 2021 <br />Table 1 . Six.Year Plan Summary <br />2022-2027 Summary Kittitas Gounty Public Facility Projects <br />1. Airport Facilities <br />Proiect Nqme Location & Description Fundins Source Schedule Total Cost <br />Wetland Mitigation for EA <br />Projects <br />Bowers Field Airport. <br />Following the <br />Environmental <br />Assessment and <br />Advanced Design, the <br />airport will undergo a <br />wetland mitigation <br />proiect. <br />FAAGA <br />Entitlement and <br />Local Match <br />2022-2026 $2,585,000 <br />Runway I l/29 Parallel <br />Taxiway and Taxiway <br />Lighting Project <br />Bowers Field Airport. <br />Construct runway new <br />taxiway including <br />pavement, lighting, and <br />markins installation <br />FAA GA <br />Entitlement and <br />other funding <br />and Local <br />Match <br />2022-2026 $5,555,000 <br />Rehabilitate Runway I 1/29 <br />including AGIS, Runway <br />Lighting, and Runway <br />Width Reduction <br />Bowers Field Airport. <br />Rehabilitate Runway <br />I l/29 including <br />completing an AGIS <br />survey, reducing the <br />runway width from 150 <br />feet to 75 feet (per FAA <br />requirements), drainage <br />improvements, and <br />replacing the runway <br />liehtins svstem. <br />FAAGA <br />Entitlement and <br />Local Match <br />2022-2026 $550,000 <br />East Apron Utilities <br />Extension <br />Bowers Field Airport. <br />Extension of utilities to <br />13 additional lots. <br />WSDOT CARB <br />Loan and Local <br />Match <br />2022-2026 $105,000 <br />Runway 7/25 Rehabilitation <br />Bowers Field Airport. <br />Rehabilitating and <br />reducing Runway 7/25 <br />length and width to <br />3"700 feet x 60 feet. <br />FAAGA <br />Entitlement and <br />Local Match <br />2022-2026 $1,320,000 <br />Airport Maintenance <br />Facility <br />Bowers Field. The <br />design and construction <br />of a 60' x 80' Airport <br />Maintenance Facility for <br />aimort equipment. <br />County General <br />Funds Request 2022 $425,000 <br />Fire Wise Program for <br />Agricultural Lands <br />Bowers Field. <br />Agricultural Land Fire <br />Wise Program with DNR <br />DNR Grant <br />Program 2022 $50,000 <br />Industrial Park Building <br />Development <br />Bowers Field. The <br />design and construction <br />of two new industrial <br />TBD 2022-2027 TBD <br />Six.Year Plan Page 2