Laserfiche WebLink
Kittitas County Capital lmprovement Program <br />Airport Facilities - Runway 7125 Rehabilitation <br />December 7, 2021 <br />(ffi <br />I <br />I@ <br />Proiect lnformation and Selection Criteria <br />Location Bowers Field Airport. Ellensburg <br />Linlrs to Other Proiects or Facilities N/A <br />Description <br />Rehabilitating and reducing Runway T l25length and width <br />to 3,700 feet X 60 feet. <br />Justili c ation (Ne ed/D em and) <br />The runway was closed due to age and deterioration. A <br />design was completedin2020 and the project will help to <br />reduce aircraft consestion. <br />Level of Sewice &O$ / Proiect Tvpe <br />Established LOS: N/A <br />Proiect Twe: Construction <br />Comorehens ive Plan Citations cF-G4. CF-P28 <br />Capital Cost 2022 2023-2027 Total <br />Desim and Ensineerinp $0 $0 <br />Consttuction $1.320.000 $1.320.000 <br />TOTAL $1,320,000 $1,320,000 <br />FundinE Sources 2022 2023-2027 Total <br />FAA GA Entitlement $0 $0 <br />Local Match $1.320.000 $1.320.000 <br />TOTAL $1.320.000 $1.320.000 <br />Annual Operations and Maintenance <br />Estimated Costs <br />Currently, the County does not frack maintenance costs for <br />these improvements. <br />Estimated Revenues None <br />Anticipated Savings Due to Proiect None <br />Departrnent Responsible for Operations Aimort Department <br />Kittitas County Airport Facilities Page 18