Laserfiche WebLink
^,Project Name: #IL Wilson-Naneum-Cherry Phase 2Wilson-Naneum-CherryLast Updated: June 21, 2021,Basis for Project: Wilson-Naneum-Cherrv AssessmentSchedule: 2023Project Description:Hydrol.ogic analysis with existing 2-d model to evatuate a potentiat Whiskey Creek tie-in at the Reecer Creek Fl.oodpl.ain project.Evatuate the effects of Mercer Creek flow routing north of the airport on hydrol.ogic regime, determine the design specificationsneeded at proposed railroad crossing, evatuate the availabl.e flood capacity within Reecer Creek fLoodpl.ain site, and assess water-right considerations downstream of the proposed reroute site.Status: PlannedectFlood Impacts: Decreased ftood risk to the West El.l.ensburg Community.Naneum, Wilson, and CherryCreek Watershed Assessment. SlllJiOil ' CHERR'WATERSHED ASSESSIIENTFunding. FCZD Levy