Laserfiche WebLink
PattiStaceyOctober1,2021Page2Intheoptionsdescribed,herearetheconsiderationsthatwouldbeaddressed:1.Baselinemodel:Validationofthespaceneedslistalreadyprepared.2.Baselinemodel:Stackingandblockingoftheprogramfromtheexistingspaceneeds.3.Baselinemodel:Conceptualplanningofthebuildingformandratiosofexteriormaterials.4.Advancedmodel:Detailedfloorplanwithtypicalwallcompositionsandnarrativeofqualityofmaterialsthroughoutthebuilding.5.Advancedmodel:Exteriormaterialandcontextualinformationforthebuildinginthedowntowncore(materialsselections,buildingenvelopedesign,windows,accessentrances,etc.)6.Advancedmodel:Overallbuildingsystems(mechanical,electrical,audiovisual,etc.)inanarrativeformforthecostestimator.7.Advancedmodel:Civilbaselineinformationandbasicsiteplanforaccesspoints,landscaping,grading,etc.a.WedidproposeacivilengineerfromKennewickinourpreviousproposalsasareference.8.Advancedmodel:AssessmentofsustainabilityrequirementsthatmaybeincorporatedtomeetstateenergycodeandsustainabilitymeasuresadoptedbyKittitasCounty.Ihaveattachedtwoimagesthatwouldbesimilartothebaselinemodelandtheadvancedmodelforyourreference.Tocompletethebaselinemodel,whichwouldincludethespaceneedsprogramming,basicsiteanalysis,narrativedescriptionfortheestimator,andfullcostestimate,weproposeafeeof$125,000.00.Toprovidetheadvancedmodel,wewouldproposeusingtheWAStateFeeScheduleforarchitecturalservicesforcompletionofapproximately40%schematicdesignandprogrammingservices.Thisproposedfeewouldbe$325,000.00.Iappreciatetheimportanceofthisnextstudytoensurethebondmeasureanticipatedin2022isaccurateandclearlydelineatestheintentandcommitmentofKittitasCountytotheconstituentsthatwouldvoteonthis-measure.Iamhappytotalkthroughtheproposalwithyouinmoredetail.ThankyouforyourcontinuedpartnershipwithDLRGroup.Sincerely,DLRGroupEricaLoyndPrincipalEL:elEncl:RenderingExamples