Laserfiche WebLink
Kittitas County Capital Improvement Program December 7, 2021 <br /> <br />Six-Year Plan Page 5 <br /> <br /> <br />Table 1 continued - Six-Year Plan Summary <br />2022-2027 Summary Kittitas County Public Facility Projects <br />5. Roads – County Owned (capital improvements scheduled for construction) <br />Project Name Location & Description Funding Source Schedule Total Cost <br />Kachess Lake Road Culvert <br />Replacement <br />MP 2.50, Kachess area. <br />Flow improvement, fish <br />barrier correction. <br />Local funds 2022 $1,329,000 <br />N. Thorp Highway – <br />Yakima River Bridge <br />MP 9.36-MP 7.76, <br />Thorp. <br />Bridge repairs. <br />Planned BRAC <br />funds, local <br />funds <br />2022 $1,951,000 <br />Manastash Road Creek <br />Bank Stab, and Snow Park <br />Improvements <br />MP 10.65-MP 11.01 <br />Roadway safety, repair <br />and improvements <br />Planned <br />FLAP/FHWA <br />funds, local <br />funds <br />2022 $1,578,000 <br />Liberty Road Swauk Creek <br />Bridge <br />MP 0.2 Liberty Road <br />Bridge replacement – <br />safety <br />Planned <br />FLAP/FHWA <br />funds, local <br />funds <br />2022-2024 $2,947,000 <br />Dickey Creek Bridge <br />(16203) Replacement <br />FHWA <br />Teanaway Road <br />Bridge replacement <br />Planned <br />FLAP/FHWA <br />funds, local <br />funds <br />2022 $1,000,000 <br />I-90 Widening (State <br />Project) <br />Cle Elum to Easton <br />Improve capacity and <br />safety <br />Local funds 2022 $100,000 <br />Bender Road Widening and <br />Pedestrian Improvements <br />MP 0.0-MP 0.68, <br />Ellensburg <br />New construction and <br />improvements <br />TBD 2025-2026 $2,100,000 <br />Hungry Junction Road <br />Widening <br />MP 0-MP 1.74, Hungry <br />Junction Road, <br />Ellensburg <br />Reconstruction and <br />safety <br />Planned RAP <br />funds, local <br />funds <br />2022-2024 $4,351,000 <br />Sanders Road Improvements <br />Ellensburg <br />Safety, stormwater <br />drainage, roadway <br />improvement <br />TBD 2026-2027 $3,050,000 <br />Badger Pocket Area Road <br />Improvements, Phase 1 <br />Various <br />Safety, rehabilitation, <br />and improvements <br />TBD 2022-2023 $3,700,000 <br />Badger Pocket Area Road <br />Improvements, Phase 2 <br />Various. <br />Safety, rehabilitation, <br />and improvements <br />TBD 2025-2026 $2,980,000 <br />Intersection and Corridor <br />Safety Improvements <br />Various <br />Safety improvements <br />and countermeasures <br />HSIP 2022-2023 $416,000 <br />Bridge Rail Improvements <br />Code 3, Phase 1 (MD A-F) <br />Various. <br />Safety improvements <br />and countermeasures <br />HSIP 2022-2023 $664,000 <br />Vantage Highway over <br />Cascade Canal (89342) <br />Replacement <br />MP 5.17-5.33, <br />Ellensburg TBD 2022-2023 $1,650,000