My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOCC Ordinance - 2022-2027 Six-Year Capital Improvement Plan
>
Meetings
>
2021
>
12. December
>
2021-12-07 10:00 AM - Commissioners' Agenda
>
BOCC Ordinance - 2022-2027 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:21:52 PM
Creation date
12/2/2021 1:18:12 PM
Metadata
Fields
Template:
Meeting
Date
12/7/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the Kittitas County Capital Improvement Program for 2022-2027 Planning Period
Order
28
Placement
Consent Agenda
Row ID
83921
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Capital Improvement Program December 7, 2021 <br /> <br />Six-Year Plan Page 12 <br /> <br /> <br />site, and water needs <br />downstream of proposed <br />reroute site <br />Table 1 continued - Six-Year Plan Summary <br />2022-2027 Summary Kittitas County Public Facility Projects <br />Project Name Location & Description Funding Source Schedule Total Cost <br />Wilson-Naneum-Cherry – <br />Phase 3 Whisky Reroute <br />Design <br />WNC. <br />Implement capital <br />recommendations from <br />Phase 2 Feasibility Study <br />FCZD Levy, <br />Flood Control <br />Assistance <br />Account <br />Program <br />(potential) <br />2025-2027 $600,000 <br />Reach Assessment (Elk <br />Meadows) <br />Yakima River. <br />Assessment to identify <br />and prioritize flood <br />alleviation and habitat <br />restoration actions within <br />the Elk Meadows area <br />along the Yakima River. <br />Request SRFB funding <br />in 2022 round for <br />implementation in <br />2023/2024. <br />FCZD Levy, <br />Salmon <br />Recovery <br />Funding Board <br />(potential) <br />2022-2024 $204,000 <br />Flow Conveyance <br />Restoration – Site 2 <br />WNC. <br />Implementation of <br />project similar to Mercer <br />at Helena flow <br />conveyance project, site <br />TBD <br />FCZD Levy, <br />Ecology <br />Centennial <br />Clean Water <br />grant (potential) <br />2022-2023 $360,000 <br />Flow Conveyance <br />Restoration – Site 3 <br />TBD. Implementation of <br />project similar to Mercer <br />at Helena flow <br />conveyance project, site <br />TBD <br />FCZD Levy, <br />Ecology <br />Centennial <br />Clean Water <br />grant (potential) <br />2025-2026 $392,000 <br />Crystal Creek Conveyance <br />Project <br />Crystal Creek. <br />Implement project <br />identified through <br />Crystal Creek CTP <br />study. <br />Grant funding <br />TBD 2022-2024 $120,000 <br />Manastash – Cove Road <br />Replacement <br />Manastash. <br />Replace existing Cove <br />Road bridge with bridge <br />of sufficient freeboard <br />and span to pass <br />sediment and flood <br />flows. <br />2026: Design and <br />Permitting. <br />FCZD Levy, <br />Flood Control <br />Assistance <br />Account <br />Program <br />(potential) <br />2026-2027 $1,200,000 <br />Hazard Mitigation Plan <br />Update <br />County-wide. <br />The Multi-jurisdictional <br />Hazard Mitigation Plan <br />needs to be updated <br />every 5-years. <br />FCZD Levy, <br />Washington <br />State <br />Department of <br />Military <br />(potential) <br />2023 $120,000
The URL can be used to link to this page
Your browser does not support the video tag.