AREANon-Local Source2022 Local2022 Non-Local2023 Local2023 Non-Local2024 Local2024 Non-Local2025 Local2025 Non-Local2026 Local2066 Non-Local2027 Local2027 Non-Local#1 FLOOD HAZARD RISK & REPETITIVE LOSS PROGRAM Yakima River FCAAP 50 150 40 40 40 30 110 <br />#3 RINGER LOOP PROPERTY IMPROVEMENTS Ringer Reach IP 200 200 <br />#5 HANSON LEVEE AND PRIVATE BERM REMOVAL Ringer Reach SRFB / IP 100 90 510 90 510 <br />#6 REECER CREEK DOLARWAY TO UNIVERSITY WNC City of Ellensburg 890 <br />#7 STREAM GAGING AND EARLY WARNING SYSTEM County-Wide 202020505050 <br />2022: Cove Road, McElroy Rd., 2022: Naneum Creek <br />#8 CTP FLOOD STUDIES General CTP 30 30 100 60 100 60 100 <br />#10 WHISKEY CREEK AT EWC SIPHON WNC Private 500 250 250 <br />#11 WNC-Phase 2 Whiskey Reroute Feasibility Study WNC 100 <br />#12 WNC-Phase 3 Whiskey Reroute Design WNC FEMA / FCAAP 4001008020 <br />Implement capital recommendations from Phase 2 Feasibility Study <br />#13 REACH ASSESSMENT (Elk Meadows)Yakima River SRFB 1001004 <br />#14 FLOW CONVEYANCE RESTORATION - SITE 2 WNC Ecology 20 70 270 <br />#15 FLOW CONVEYANCE RESTORATION - SITE 3 TBD Ecology 20 82 290 <br />#16 CRYSTAL CREEK CONVEYANCE PROJECT Crystal Creek 10020 <br />Implement project identified through Crystal Creek CTP study <br />#17 MANASTASH - COVE ROAD REPLACEMENT Manastash FCAAP 1000200 <br />#18 HAZARD MITIGATION PLAN UPDATE Dept. of MilitaryCounty-Wide 20 100 <br />1564 600 660 770 280 610 250 690 302 290 210 1610 <br />Comprehensive Flood Planning and Repetitive Loss Hazard Assessment <br />Control for invasive species, riparian buffer plantings, and building decomissioning at County-owned properties <br />Implementation of preferred alternantive from Hanson Pits Restoration Plan and Design . 2023 SRFB design only <br />grant. <br />Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct <br />setback levees and construct second bridge alongg Dolarway Rd. <br />Continued funding through FEMA's Cooperating Technical Partnership (CTP) program to improve flood models and <br />channel migration zone mapping. <br />Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing <br />current EWC crossing at Whiskey Creek with a siphon. KCCD managed project, with FCZD cost-share. <br />Hydrologic analysis with existing 2-d model to evaluate Whiskey Creek tie-in at Reecer Creek project. Evaluate <br />effects of Mercer Creek flow routing north of the airport on hydrologic regime, design specification needed at <br />proposed railroad crossing, and within Reecer Creek floodplain site, and water needs downstream of proposed <br />reroute site. <br />Assessment to identify and prioritize flood alleviation and habitat restoration actions within the Elk Meadows area <br />along the Yakima River. Request SRFB funding in 2022 round for implementation in 2023/2024. <br />Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />Replace existing Cove Road bridge with bridge of sufficient freeboard and span to pass sediment and flood flows. <br />2026: Design and Permitting <br />The Multi-jurisdictional Hazard Mitigation Plan needs to be updated every 5-years. <br />CAPITAL PROGRAM ANNUAL TOTAL (LOCAL AND NON-LOCAL AMOUNTS IDENTIFIED) <br />Costs are shown as thousands <br />KITTITAS COUNTY FLOOD CONTROL ZONE <br />2022-2027 <br />SIX YEAR CAPITAL FACILITY PLAN