My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-173
>
Meetings
>
2021
>
11. November
>
2021-11-16 10:00 AM - Commissioners' Agenda
>
Res-2021-173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:21:23 AM
Creation date
11/22/2021 11:20:35 AM
Metadata
Fields
Template:
Meeting
Date
11/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
a
Item
Request to Approve a Resolution for the Meadows Development Agreement Resolution (DV-19-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
83269
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EncomDass <br />ENGTNEEFUNG & suaavevrr.ro <br />The Disttict is currently modeling the water system bosed on the cu*ent <br />-site planfar the plat ofMarian Meadows to confirm ptpi tutltl,- rrseyoi, elevation, etc. Based on the Disnict,s approved <br />'r:::;;!:J:ive water Ptan i"a p'"'iii <br />^oaun, r, i" '",i$",ratefotrowing improvements wi, <br />t A 30'diameter by 25'tatt reservoir (l!2,j00 gatlons) wiil be required to be constructedu'ith an overflow erevation at 2,J4s.bo. rn" ,zru*oi lnifi, a concrete Mt Baker s,otank or approved equal. In addition, pr.ovisions wiil be ,"'qrir"a * enstffe the new reservoirfflrf^'*r reservairs Jill equalrv. 'ft i, *oy ,rqui* i, oinua, varve(s) and/or other <br />' The internal water system within the Marion Meadows ptat will be required to be an g-inchdiameter looped piping system per nirtrtrt stondards ruiti inttertie connections to theexisting water mains located ai country Drive Road oni n'ipork, way. In addition, an g_,:::"::::,:.,,, be required near the ",ri Ja" "t,t* in i"i ifuoao^ ptat for futuret Tlze District's telemetry system will he re,quired to be updated or replaced to providecommunication between the existing werti, existing re;;;;;;, and praposed reservoir. <br />September 9,2019 <br />Jeny Martens <br />Agent for Easlon Ridge Company <br />P.O. Box 458 <br />CIe Elum, WAggg2l <br />RE: Easton Water District <br />Water Service to fhe plat of Marian Meadows <br />Dear Mr. Martens, <br />I;1lf"t*:3,u*orattached <br />as an addendum a for the District to <br />This letter is being written in response to your letter to Easton waterDistrict dated August 19, 2019. Thefollowing is the District's response to ilt.iirioritems r"quesi.a *itrri" the retter to the District: <br />I ' Acknowledgment that the District is finalizing an agreement (DEA) for use (we have received thestandard form draft but the has yet to ue eaitel to "jar"r, it " rurrnon Meadows project) <br />The District is cy*eltbt luarkingwith their attorney (Richard Jonson) and District Engineer (chadAllen) in preparing the DevebpZr Extension Agreem'ent. irior toJtnalizing the DeveloperExtension Agreeme.nt' a meeting wilt be necessary with the Easton Ridge company and the Districtto discuss the required improviments to the water system and associated costs. <br />2. <br />Western Washin gton Division <br />I 65.NE Juniper St., Ste 20i, Issaquah, WA gg0l7 <br />Phone: t4ZS)392-0250 <br />wranv.EncompassEs.net <br />Eastern Washington Division <br />407 Swiftwater Blvd. Cle Elum, WA 9g922 <br />Phone: (509) 674-7433
The URL can be used to link to this page
Your browser does not support the video tag.