My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement
>
Meetings
>
2021
>
11. November
>
2021-11-16 10:00 AM - Commissioners' Agenda
>
DV-19-00001 Marian Meadows Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 12:40:20 PM
Creation date
11/10/2021 12:37:19 PM
Metadata
Fields
Template:
Meeting
Date
11/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Request to Approve a Resolution for the Meadows Development Agreement Resolution (DV-19-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
83269
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Encompass <br />ENGINEERING & SURVEYING <br />September 9, 2019 <br />Jerry Martens <br />Agent for Easton Ridge Company <br />P.O. Box 458 <br />Cie Elum, WA 98922 <br />RE: Easton Water District <br />Water Service to the Plat of Marian Meadows <br />Dear Mr. Martens, <br />This letter is being written in response to your letter to Easton Water District dated August 19, 2019. The <br />following is the District's response to the list of items requested within the letter to the District: <br />1. Acknowledgment that the District is finalizing an agreement (DEA) for use (we have received the <br />standard form draft but the has yet to be edited to address the Marion Meadows Project) <br />The District is currently working with their attorney (Richard Jonson) and District Engineer (Chad <br />Allen) in preparing the Developer Extension Agreement. Prior to finalizing the Developer <br />Extension Agreement, a meeting will be necessary with the Easton Ridge Company and the District <br />to discuss the required improvements to the water system and associated costs. <br />2. Within the DEA or attached as an addendum a scope of needed District Improvements for the District to <br />provide water service. <br />The District is currently modeling the water system based on the current site plan for the Plat of <br />Marian Meadows to confirm pipe size (s), reservoir elevation, etc. Based on the District's approved <br />Comprehensive Water Plan and previous models, it is anticipated the following improvements will <br />be required: <br />• A 30' diameter by 25' tall reservoir (132,100 gallons) will be required to be constructed <br />with an overflow elevation at 2,345. 00. The reservoir shall be a concrete Mt Baker Silo <br />tank or approved equal. In addition, provisions will be required to ensure the new reservoir <br />and existing reservoirs fall equally. This may require an altitude valve(s) and/or other <br />device. <br />• The internal water system within the Marion Meadows Plat will be required to be an 8 -inch <br />diameter looped piping system per District Standards with intertie connections to the <br />existing water mains located at Country Drive Road and E Sparks Way. In addition, an fl- <br />inch stub will be required near the east side of the Marion Meadows Plat for future <br />connection. <br />• The District's telemetry system will be required to be updated or replaced to provide <br />communication between the existing wells, existing reservoirs and proposed reservoir. <br />Western Washington Division <br />165 NE Juniper St., Ste 201, Issaquah, WA 98027 <br />Phone: (425) 392-0250 <br />wm,w.Enco mpassE S .net <br />Eastern Washington Division <br />407 Swiftwater Blvd, Cle Elum, WA 98922 <br />Phone: (509) 674-7433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.