My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement
>
Meetings
>
2021
>
11. November
>
2021-11-16 10:00 AM - Commissioners' Agenda
>
DV-19-00001 Marian Meadows Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 12:40:20 PM
Creation date
11/10/2021 12:37:19 PM
Metadata
Fields
Template:
Meeting
Date
11/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Request to Approve a Resolution for the Meadows Development Agreement Resolution (DV-19-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
83269
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY WATER DISTRICT NO. 3 <br />RESOLUTION NO. <br />A RESOLUTION adopting a special connection charge for <br />parcels located within Sec. 1, T20N., R13E., W.M., <br />Kittitas Co,, WA, an amending, in part, Resolution No - <br />030796 -2', subject to certain conditions. <br />WHEREAS, by Resolution No. 030795-2, the Board of <br />Commissioners of the District adopted a general facility <br />connection charge in accordance.with RM4 57.08.005(10) in the <br />amount of $2,260- per residence or residential equivalent; <br />tu-?3EREAS, the Easton_ Ridge Land company ("Developer") is in <br />the process of developing almost all of Section 1, Township 20 <br />North, Range 13 East., W:M., of Kittitas County, Washington (the <br />"Easton Ridge Property") into residential lots and has expended <br />substantial sums to transfer`a Northern Pacific Railroad Water <br />Right to the District, to change points of withdrawal of two <br />other District water rights and to change the area of use of all <br />District water rights to include the Easton Ridge Property; and <br />the Developer has also expended substantial sums to update the <br />` District's water system aompreb;ensive plan for which the District <br />was required to do regardless of whether the Easton Ridge <br />Property was developed.; <br />WHEREAS, in the course of developing the first forty lots or <br />the Easton Ridge Property, the District will require the <br />Developer to install a 100,000 gallon water reservoir within such <br />property at the same elevation as the District's existing <br />reservoir on Cabin Creek Road and install an eight inch water <br />main connecting the Easton Ridge Property to an existing District <br />water main: on Cross country Drive; and, upon commencement of the <br />second division of the Easton Ridge Property (beginning with the <br />forty-first lot), the District will require the Developer to <br />install a water main loop from the new reservoir to an existing <br />District water main on Sparks Road near the Southwest corner of <br />the Easton Ridge Property; <br />WHEREAS,. portions of the foregoing work will benefit the <br />entire District and.have been determined by the Board of <br />Commissioners to constitute general facilities of the District; <br />and the cost.of such work has been identified by the Developer as <br />uaa"nn 10 lfllar dal,:i n qn nL deS <br />
The URL can be used to link to this page
Your browser does not support the video tag.