My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-165 Prelim Plat
>
Meetings
>
2021
>
11. November
>
2021-11-02 10:00 AM - Commissioners' Agenda
>
Res-2021-165 Prelim Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 1:25:22 PM
Creation date
11/9/2021 1:25:17 PM
Metadata
Fields
Template:
Meeting
Date
11/2/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution for the Suncadia Phase 3 Division 17 Tumble Creek Preliminary Plat
Order
6
Placement
Consent Agenda
Row ID
82799
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. All development, design and construction shall comply with all applicable laws as defined in the <br />Development Agreement. <br />9. New Private Road Names will be required to complete a private road naming application prior to final <br />approval. <br />10. The applicant shall contact the Kittitas County Rural Addressing Coordinator at (509) 962-7523 to <br />obtain addresses prior to obtaining a building permit. A parcel cannot receive a building permit or <br />utilities until such parcel is identified with a 911 address. <br />1 1. Civil Plans will be reviewed and approved as submitted prior to final plat approval in accordance with <br />the Development Agreement. <br />12. The applicant shall submit documentation verifring stormwater runoff in this division is <br />consistent with the Master Drainage Plan for the site. <br />13. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed and <br />completed or bonded or other financial guaranties or accommodations made for their completion prior <br />to final plat approval ofeach subphase. <br />14. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 Infrastructure, <br />Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site <br />Development Plan must be provided and available for use before the issuance of the first certificate of <br />occupancy for Master Planned Resort Accommodation Units included with such plan. For purposes <br />of final plat approval or issuance of building permits, infrastructure may be guaranteed through surety <br />bonding or other financial assurance device acceptable to the County. The estimated costs of <br />providing all such guaranteed Infrastructure shall be reviewed and approved by the County Public <br />Works Director or designee. Surety bonding or other financial device provided to the County shall be <br />in an amount equal to at least 110% of such estimated costs as determined by Trendwest's architects <br />and engineers. <br />15. All Cultural resources shall be handled as identified in Exhibit F-l, C-21-23 of the Development <br />Agreement. Please see index #32 of the index file for this proposal (LP-21 -00002). <br />NOW, THEREFORE BE IT RESOLVED: That the Kittitas County Board of Commissioners hereby <br />grants preliminary plat approval to the Suncadia Phase 3 Division 17 Tumble Creek Preliminary Plat (LP- <br />2l-00002) and adopts the above Findings of Fact, Conclusions of Law, and Conditions of Approval and the <br />same hereby proposed development configuration (See Exhibit A). <br />DATED this ,2021 at Ellensburg, Washington. <br />4
The URL can be used to link to this page
Your browser does not support the video tag.