Laserfiche WebLink
lit,.li.trirr,:, il!1i,,!i.ri.).Lrr:Ll'ilrt'ti tllltlii]!rLr'lrtr:ltl5 lt;:,ltL.il !!lL,lLtiills <br />New manufactured home park or subdivision <br />A manufactured home park or subdivision for which the construction of facilities for servicing <br />the lots on which the manufactured homes are to be affixed (including at a minimum, the <br />installation of utilities, the construction of streets, and either final site grading or the pouring <br />of concrete pads) is completed on or after the effective date of adopted floodplain <br />management regulations. <br />Otls:-IrrttrtJled yeitt floorl o1 I0{ilycaq tlcio_ei <br />lri:i: Ii',1',t,' i]i,;iiii <br />Rqqstrllgi:ly S;rfe fl urrt Flaq{iqg <br />tir.rl tlir: it,!'vi::,1 fio,..rt t,; ri le'iil trlqt-r {1.:<1!,.lb!lvltr, tlrc }lrilhesl l\t,1.i1.i'r,tl i:rr.r<.lt: <br />Recreational vehicle <br />A vehicle which is: <br />1. Built on a single chassis; <br />2. Four hundred square feet or less when measured at the largest horizontal projection; <br />3. Designed to be self-propelled or permanently towable by a light duty truck; and <br />4. Designed primarily not for use as a permanent dwelling but as temporary living quarters <br />for recreational, camping, travel, or seasonal use; <br />:,r {it ;ri iJcJtrtrrj l.ry Ki {. 11,,1;u4.,0;]5 <br />Riverine <br />Relating to, formed by, or resembling a river (including tributaries), stream, brook, etc. <br />Start of construction <br />lncludes substantial improvement, and means the date the building permit was issued, <br />provided the actual staft of construction, repair, reconstruction, rclrabrirlr:-ti,Jr, qtd!1tLlei:, <br />placement or other improvement was within 180 days of the permit date. The actual start <br />means either the first placement of permanent construction of a structure on a site, such as <br />the pouring of slab or footings, the installation of piles, the construction of columns, or any <br />work beyond the stage of excavation; or the placement of a manufactured home on a <br />foundation. Permanent construction does not include land preparation, such as clearing, <br />grading and filling; nor does it include the installation of streets and/or walkways; nor does it <br />include excavation for a basement, footings, piers, or foundations or the erection of <br />a substantial improvement, the actual start of construction means the first alteration of any <br />wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects <br />the external dimensions of the building. <br />Structure <br />A walled and roofed building, including gas or liquid storage tanks, that are principally above <br />ground, ir rnrl:l l rls .:r !1'rilrli r f <J!.!U l q[i l.]-olll-e. <br />Substantial damage