My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph 3 Div 17 BOCC Staff Report (amended)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph 3 Div 17 BOCC Staff Report (amended)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2021 9:10:17 AM
Creation date
10/19/2021 9:10:05 AM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Notes
Removal of condition # 16 per Public Works request.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />12 <br /> <br />7. The Final Plat shall contain the name of the Engineer/Surveyor responsible for preparing the documents on all <br />sheets. <br /> <br />8. All development, design and construction shall comply with all applicable laws as defined in the <br />Development Agreement. <br /> <br />9. New Private Road Names will be required to complete a private road naming application prior to final <br />approval. <br /> <br />10. The applicant shall contact the Kittitas County Rural Addressing Coordinator at (509) 962-7523 to obtain <br />addresses prior to obtaining a building permit. A parcel cannot receive a building permit or utilities until such <br />parcel is identified with a 911 address. <br /> <br />11. Civil Plans will be reviewed and approved as submitted prior to final plat approval in accordance with the <br />Development Agreement. <br /> <br />12. The applicant shall submit documentation verifying stormwater runoff in this division is consistent with <br />the Master Drainage Plan for the site. <br /> <br />13. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed and <br />completed or bonded or other financial guaranties or accommodations made for their completion prior to final <br />plat approval of each subphase. <br /> <br />14. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 Infrastructure, Surety <br />Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site Development Plan <br />must be provided and available for use before the issuance of the first certificate of occupancy for Master <br />Planned Resort Accommodation Units included with such plan. For purposes of final plat approval or <br />issuance of building permits, infrastructure may be guaranteed through surety bonding or other financial <br />assurance device acceptable to the County. The estimated costs of providing all such guaranteed <br />Infrastructure shall be reviewed and approved by the County Public Works Director or designee. Surety <br />bonding or other financial device provided to the County shall be in an amount equal to at least 110% of such <br />estimated costs as determined by Trendwest’s architects and engineers. <br /> <br />15. All Cultural resources shall be handled as identified in Exhibit F-1, C-21-23 of the Development Agreement. <br />Please see index #32 of the index file for this proposal (LP-21-00002). <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.