My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHBIT .J (Rev. 1) to Development Agreement <br />Development Standards and Design Guidelines for <br />MountainStar Master Planned Resort <br />December 2, 2008 <br />Design landscape to encourage and promote water conservation. <br />Site buildings to minimize grading and maintain a low. subordinate <br />profile against the back drop of the surrounding forests. <br />Design landscape that blends the at·chitecture with the natural <br />environment. Incorporate natural and existing landscape features such as <br />rock outcroppings. vegetation and topography into landscape designs to <br />help achieve the transition between the built and natural environments <br />Contain storm \Vater and snow melt within the Homesite and encourage <br />natural infiltration on-site through infiltration swales that appear natural. <br />A Homesite Diagram \Viii be prepared for each Homesite. The diagram will establish the <br />boundaries of the Building Envelope, Secondary Envelope (applicable to some Homesites) and <br />Natural Area within each homesite. <br />All landscaping shall be completed within one year of completion of construction of the exterior <br />of the residence. <br />*** <br />Suncadia Master Planned Resort E>:hibiT J-Developmem Standards <br />12 December 2, 2008 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.