My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHBIT J (Rev. 1) to Development Agreement <br />Development Standards and Design Guidelines for <br />MountainStar Master Planned Resort <br />December 2, 2008 <br />TABLE 2 -SUNCADIA PATH AND TRAIL MATRIX (5/18/07) <br />PAVED PATH TRAIL NATURE <br />TRAIL <br />Uses-Pedestrians, (I )Pedestrians, fat (I) Pedestrians <br />Summer/Spring/Fall wheelchairs. bicycles. tire bicycles. fat tire <br />strollers, rollerblades, strollers <br />skateboards <br />Uses-Winter Pedestrians, CC skiing (I) CC skiing and ( I ) Pedestrians <br />and snow shoeing on snow shoeing on <br />selected path segments selected trails <br />i\lotorized vehicle \llaintenance. security, i'vlaintenance. NA <br />use Emergency Services, security, Emergency <br />Mechanized track Services, <br />cutting 1'-·1echanized track <br />cutting <br />l'vlax. Percentage 5%(2) 12% max. desired, <40% <br />Grade Exceptions to 20% <br />Width I 0' (Pavement) 4'-8' 2'-4" <br />Shoulder width I'. transitions from NA NA <br />asphalt to grade. <br />Vegetation 5' to limbs and shrubs. 2'-5' to limbs and 0 <br />Clearance, 1'-2' for trees shrubs. <br />Horizontal I' -2' to trees <br />Vegetation I 0', for a width of +I-10' 8' <br />Clearance. Vertical 14' <br />Base material 4" crushed rock. to Native/existing soil Native/existing <br />extend under and binder soil <br />shoulders <br />Surface material 2" Asphalt Depth of 4" '1. Native/existing <br />minus Aggregate soil <br />with binder, or Possible wood <br />existing if chips <br />granular/durable Possible <br />limited gravel <br />Slope for drainage 2% cross slope 2%, fit conditions 2%, fit <br />conditions <br />tvlaintenance Powersweep Pruning Pruning <br />(Summer) Pruning Surface maintenance Surface <br />Surface maintenance Sign maintenance maintenance <br />Sign maintenance Sign <br />maintenance <br />Maintenance Cut tracks in some Cut tracks in some None <br />(Winter) segn1ents. segments <br />Plow some segments. <br />Detail reference# PP-1 T-1 NT-I <br />Notes: <br />(1) Periodic closures for fish and wildlife. <br />EQUESTRIAN TRAIL <br />(I) Horses, pedestrians. <br />fat tire bicycles, fat tire <br />strollers <br />(I ) Pedestrians, CC skiing <br />and snow shoeing on <br />selected trai Is <br />Maintenance, security, <br />Emergency Services, <br />Mechanized track cutting <br /><40% <br />+/-1 0' goal, but +/-2' at <br />steep slopes <br />NA <br />2'-5' to limbs and shrubs. <br />I' -2' to trees <br />12' <br />Native/existing soil <br />Possible gravel <br />Native/existing soil <br />Possible wood chips <br />Possible gravel <br />2%, fit conditions <br />Pruning <br />Surface maintenance <br />Sign maintenance <br />Cut tracks in some <br />Seg111ents <br />ET-1 <br />(2) Up to 5% is acceptable. Up to I 0% over several hundred feet, acceptable on a case-by- <br />case basis. at discretion of Suncadia. <br />Suncadia Master Planned Resort Exhibit J-De1•elopment Standards <br />5 December 2, 2008 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.