My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v. identification of intersections or road segments that are approaching Kittitas County <br />LOS standards <br />VI. the results of any of the other monitoring elements beyond traftic volumes that are <br />identified in this Condition or required by the approved monitoring plan <br />vii. recommendations on any changes to the timing or type of traffic mitigation <br />proposed, to maintain acceptable LOS. consistent with accepted transportation <br />planning and engineering practices. <br />viii. Additional information as may be required by Director of Public Works, based on <br />the results and recommendations ofprevious monitoring reports. <br />I. Trendwest, WSDOT and/or the Cities shall receive a copy of any monitoring report that <br />addresses traffic within their jurisdiction and be provided an opportunity to comment. <br />The County shall make a decision on the results of the monitoring program, including <br />any decision to modifY any of the traffic mitigation after consideration of input received. <br />C-18 SR 903 Studv. On or before September 30. 2002. the applicant shall study the traffic <br />operations for the segment of SR 903 between Bullfrog Road and Morrel Road, just west of <br />Ronald. The focus of this •would be to identify potential improvements to this road segment <br />consistent with goals identified in a community planning process. The scope of this analysis <br />shall first be submitted to WSDOT and the City of Roslyn for review and comment, and <br />opportunity should be given for public comment on this scope prior to commencement of the <br />study or implementation of any recommendations. <br />C-19 Evaluation of Shuttle Service. Not later than occupancy of 2500 MPR units, the applicant <br />shall investigate the feasibility of operating a shuttle service between Roslyn, Cle Elum and the <br />MPR as a means to reduce MPR generated tratlic. This feasibility study shall include an <br />opportunity for public comment on any such proposal. and shall address realistic funding <br />sources. Requirements for trat1ic improvements will be reconsidered and may be reduced. if this <br />study results in operation of a shuttle program that produces traffic reductions sufficient to <br />support reductions in mitigation requirements. <br />C-20 Roslvn/MPR Trail Connection. To reduce off-site traffic and parking demand in Roslyn, <br />the applicant may be required to provide a trai I linking the MPR trail system to the Roslyn street <br />system. A parking lot sized to accommodate demand may also be required at a trailhead within <br />the MPR to facilitate this pedestrian connection. <br />C-20A Utilitv Franchises. No utilities may be installed within public rights of way, except <br />pursuant to the terms of an approved Utility Franchise Agreement and with necessary right of <br />way permits from the County or respective City \vhose right-of-way is being impacted. <br />C-208 Right of Wav. The applicant shall be required to dedicate without any cost to the County <br />any additional right of way owned by the applicant that is necessary for any of the required <br />access or off-site traffic mitigation improvements that are to be transferred to County ownership. <br />If the necessary right of way is not owned by the applicant. then condemnation costs shall be <br />allocated according to the proportionate share calculations for the particular improvement. <br />Suncadia l'v1PR Conditions of Approval <br />December 2, 2008 <br />Page 25 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.