My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the overall scale and intensity of such facilities and amenities shall not significantly exceed the <br />scale and intensity of such facilities and amenities analyzed in the MountainS tar EIS, (iii) the <br />location, quantity and type of Master Planned Resort Accommodation Units. provided overall <br />housing density at full build-out shall not exceed 4,650 Master Planned Reson Accommodation <br />Units, and (iv) changes allowed under Section 4.1 (g)(2) and Section 6. I. If. notwithstanding the <br />foregoing, the BOCC detennines that a proposed General Site Plan deviates significantly from <br />the Conceptual Master Plan or the Development Agreement, then the General Site Plan shall be <br />reviewed and acted upon by the BOCC following Community Development Services review and <br />recommendations and. should the BOCC so elect, the review and recommendation of the <br />Planning Commission. In order to approve a deviation from the Conceptual Master Plan or <br />Development Agreement proposed in a General Site Plan. the BOCC shall find that the probable <br />significant adverse environmental impacts associated with such deviation are the same as, or are <br />not significantly greater than, those impacts analyzed in the MountainStar EIS. In the event the <br />BOCC finds that any such significant deviation is likely to have new. probable significant <br />adverse impacts that are not mitigated. or impacts significantly greater than those analyzed in the <br />MountainStar EIS, the County shall conduct further environmental review under SEPA and may <br />impose additional mitigation conditions as deemed necessary, consistent with the Planned Action <br />Ordinance. All approved deviations shall be documented by the County, and, unless such <br />documentation indicates to the contrary. shall be allowed for Subsequent Actions without further <br />review or approval or statements required under Sections 5.1 (g)(3) or 5.1 (h)(ll )or amending <br />action under Section 6.2. <br />(d) Review and Approval of Site Development Plan. A Site Development <br />Plan shall be reviewed and approved by the County in the same manner as General Site Plans <br />Suncadia Master Pianned Reson Development Agreement (Amended and Restated 12-02-2008) Page 37 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.