Laserfiche WebLink
<br /> Page 2 of 3 <br /> <br /> <br />TABLE W-1 <br />Suncadia Development No. Units* <br />Phase 1 Division 3 Winemakers Cabins 24 <br />Phase 2 Division 1 Nelson Creek 36 <br />Phase 2 Division 4 Cabins at the Farm 39 <br />Phase 2 Division 6 Nelson Ridge 42 <br />Phase 3 Division 17 ** 80 <br />Total 221 <br />* Includes consolidated units post final plat; does not decipher <br /> between full-time and part-time use connections. <br />** Currently in preliminary plat. <br /> <br />Washington State Department of Archaeology and Historic Preservation – Sydney Hanson <br />Response: The Suncadia resort property was extensively surveyed for cultural and historic sites during <br />the environmental impact process culminating in the identification of sites as well as adoption of <br />appropriate mitigation measures as set forth in Conditions of Approval C-21 – C-23 of Exhibit F to the <br />Development Agreement with Kittitas County. Central Washington Anthropological Survey (CWAS) has <br />been retained by Suncadia to perform archaeological subsurface testing within the 150-foot buffer of <br />site 45KT1363. Subsurface testing will be completed by CWAS and recorded with the Department of <br />Archaeology and Historic Preservation prior to any disturbance to the site buffer. Anticipated date of <br />report completion is by November 30, 2021. There are no development plans within the defined border <br />of site 45KT1363. Suncadia is very sensitive to cultural resources and intend to preserve, protect, and <br />follow all applicable rules and regulations. <br /> <br />Kittitas County Public Works – Public Works Plan Review Team <br />Response: Suncadia acknowledges conditions 1-4 of preliminary approval from Kittitas County Public <br />Works and will address prior to final plat. Regarding accounting method for water connections, please <br />see response to Russell Mau with the Washington State Department of Health Office of Drinking Water. <br />Regarding wastewater, additional utility reporting requirements established post October 1, 2000 do not <br />apply to Suncadia, including waste water treatment, but as a courtesy with regard to the public works <br />request, 1,079 sewer connections have been made out of the 3,787 ERU allotment from the wastewater <br />treatment facility. Regarding traffic monitoring, Traffic impacts of the MPR continue to remain <br />considerably lower than the initial estimates in the MPR-FEIS. Pursuant to the 2014 Traffic Monitoring <br />Report, on January 13, 2015, Kittitas County waived further traffic monitoring pending certain <br />conditions, none of which have yet occurred. Suncadia requests that a meeting be held in the near <br />future to discuss the type and timing of transportation monitoring going forward. <br /> <br />Washington State Department of Ecology – Gwen Clear <br />Response: The applicant will adhere to all applicable regulations outlined in the Development <br />Agreement, the Erosion Control Plan, and the MPR Conditions of Approval. For construction activities, <br />Suncadia Resort LLC maintains a stormwater pollution prevention plan for the entire MPR that will also <br />be applicable to the development of Phase 3 Division 17. An NPDES permit for MPR construction <br />activities has been issued by the Washington State Department of Ecology (Permit No. WA-005236-1). <br />Conditions of the permit specify erosion control measures that will be used during construction <br />activities. <br /> <br />Index #30