My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph 3 Div 17 BOCC Staff Report
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph 3 Div 17 BOCC Staff Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:49:44 PM
Creation date
10/14/2021 1:48:05 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />10 <br /> <br /> <br />As conditioned below, the application does not appear to be detrimental to the general public health, safety or <br />welfare and meets the basic intent and criteria associated with Title 12, Title 16.08, Title 16.12, Title 17.37 and <br />Title 17A of the Kittitas County Code, the Kittitas County Comprehensive Plan, and the Development <br />Agreement. Staff recommends approval of the Suncadia Phase 3 Division 17 Preliminary Plat LP-21-00002, <br />subject to the following findings of fact, conclusions, and conditions: <br /> <br />Suggested Findings of Fact <br /> <br />1. Steven Lathrop, authorized agent for Suncadia Resort, LLC, landowner, submitted an application for an 80 <br />detached residential lot plat with access, community/recreational open spaces and other natural open space tracts <br />on approximately 620.11 acres of land that is zoned Master Planned Resort. The proposed lots range in size from <br />14,500 to 45,200 square feet. In conjunction with this preliminary plat application, a site development plan was <br />submitted for Suncadia Phase 3 Division 17 Tumble Creek. <br /> <br />2. Site Information: <br /> <br />The subject property is located in SEC. 15, TWP. 20, RGE. 14; Parcel Number 11833, Assessor’s Map number <br />20-14-15000-0005. <br /> <br /> <br /> <br />3. The Comprehensive Plan designation is Rural Recreation. <br /> <br />4. The subject property is zoned Master Planned Resort, which allows for a variety of residential densities. <br /> <br />Site Information <br />Total Project Size: 620.11 Acres <br />Number of Lots: 80; ranging in size from 14,500 to 45,200 square feet <br />Domestic Water: Community Water System <br />Sewage Disposal: Community Septic System <br />Fire Protection: Fire District 7 <br />Irrigation District: None <br /> <br />Site Characteristics: <br />North: Largely wooded <br />South: Residential development and wooded areas (all within Suncadia Master Plan Resort) <br />East: Largely wooded undeveloped areas (all within Suncadia Master Plan Resort) <br />West: Residential development and wooded areas (all within Suncadia Master Plan Resort) <br /> <br />Access: Primary access to the site will be provided via Tumble Creek Drive. <br /> <br /> <br />5. A long plat application, and site development plan application was submitted to Community Development <br />Services on August 10, 2021. Pursuant to section 5.1 of the development agreement, the application submittal <br />packet was sent to department heads “deemed appropriate”. A notice of application was sent to all property <br />owners within 500 feet of the project site and adjoining ownership properties. The notice of application was <br />noticed in the local county paper of record on August 26, 2021. <br /> <br />6. Based upon review of the submitted application materials including an environmental checklist, the <br />application was found to be consistent with Development Agreement, Environmental Impact Statement, <br />General Site Plans and Site Development Plan and as such no additional review is required.
The URL can be used to link to this page
Your browser does not support the video tag.