My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA McKinstry
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
PSA McKinstry
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:59:50 AM
Creation date
7/21/2021 9:58:35 AM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
c
Item
Request to Approve a Professional Service Agreement with McKinstry for the Event Center
Order
3
Placement
Consent Agenda
Row ID
68283
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />SCOPE OF WORK <br />In addition to providing all material and labor, the Contractor shall perform the following <br />Scope of work, Per McKinstry Letter dated June 5,2020, includes equipment, labor and <br />materials to perform the following work: <br />. Engineering Services including the following: <br />o Record pre-construction supply and exhaust readings for engineering <br />calculations <br />o Provide engineering sketch of each area showing new readings and specific <br />construction notes.. Demolition of Ceiling for access to new damper locations. We have assumed these <br />are sheetrock ceilings at location of Dampers and Grilles. An allowance has been <br />included for attaching plywood sheeting to cover the access while our team is not <br />present. <br />. Cqncrete Cutting has been included for (3) locations to route the 10" exhaust duct <br />from the Booking Area to the exterior of the building. <br />. New Exhaust System has the following items included in our budget: <br />. 500 cfm Exhaust Fan <br />o 10" duct from Grille to exterior of building <br />o Flashing and sealing of wallpenetrations <br />o Air Balance of system <br />' Volume Damper installation on the 2nd floor for control of each of the "Negative <br />PressureZones" <br />. Air balance of exhaust system on the 2nd floor. <br />EXCTUSTONS <br />. Electrical work of any nature <br />. Motor replacement if needed for new air volumes <br />. Dedicated makeup air unit <br />. Sales, Use and B&O tax <br />. Hazardous materials assessment, removal, or disposal <br />. Any work not specifically noted as included in this proposal <br />. Overtime, double time and shift premiums <br />. Unforeseen and hidden conditions <br />. Performance and payment bonds <br />. Materialcostescalation <br />Professional Services Agreement (rev. 091241201 8) <br />Page 13 of 18
The URL can be used to link to this page
Your browser does not support the video tag.