My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA HDR Engineering
>
Meetings
>
2021
>
03. March
>
2021-03-02 10:00 AM - Commissioners' Agenda
>
PSA HDR Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 9:58:59 AM
Creation date
7/21/2021 9:58:25 AM
Metadata
Fields
Template:
Meeting
Date
3/2/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
c
Item
Request to Approve a Professional Services Agreement with HDR Engineering, Inc.
Order
3
Placement
Consent Agenda
Row ID
73221
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DELIVERABLES. Draft and final meeting agenda and presentation materials (Word, PDF, and PowerPoint <br />format, as appropriate, electronic only).. Draft and final meeting notes (Word format, electronic only).. Draft and final feasibility study and preliminary action plan (Word format, electronic only). <br />Schedule <br />County issues notice to proceed (NTP) - Estimated March 10,2021 <br />HDR issues request for information (RFl) - Within 2 days of NTP <br />County provides RFI documents - Within 1 week of NTP <br />lnitial kick-off meeting - Within 1 week of NTP <br />lnitial stakeholder engagement meeting - 2 weeks after initial kick-off meeting <br />HDR issues draft technical benchmarking memo - 1 week after stakeholder engagement <br />Conduct County workshop to review technical memo - 1 week after draft technical <br />benchmarking memo issued <br />HDR issues final technical benchmarking memo - 1 week after workshop <br />HDR issues draft secondary recycling market feasibility study and preliminary action plan <br />- 3 weeks after final benchmarking memo <br />Conduct County workshop to review feasibility study and preliminary action plan - 2 <br />weeks after draft feasibility study <br />Conduct stakeholder engagement meeting to review feasibility study and preliminary <br />action plan - 3 weeks after workshop <br />HDR issues final feasibility study and preliminary action plan - 2 weeks after stakeholder <br />engagement <br />Estimated Fees and Disbursements <br />Compensation for proposed services will be billed on a Time and Materials basis. The total fee for <br />these services is not to exceed $34,500.00, unless mutually agreed upon by HDR and the Client. <br />Table L Schedule of Fees <br />Task Task Name Amount <br />1 <br />2 <br />3 <br />4 <br />5 <br />$1,700.00 <br />$2,200.00 <br />$6,600.00 <br />$16,700.00 <br />$7,300.00 <br />$34,500.00 <br />Project Management <br />Project lnitiation and Scope Refinement <br />Stakeholder Engagement <br />Research Recyclable End-Markets and Benchmarking Exercise <br />Secondary Recycling Market Feasibility Study and Preliminary <br />Action Plan <br />TOTAL
The URL can be used to link to this page
Your browser does not support the video tag.