Laserfiche WebLink
Mass X Construction Labor Rates <br />Colockum Demolition <br />Excavator Operator Excavator Operator Roller &SkidsteerTradeclassificationRatesLaborerDumpTruckDriver Grader OperatorUnder15TNOver15TNOperator <br />Base Rate $42.32 $49.38 $69.33 $69.87 $66.30 $70.49 <br />FICA (SS &Medicare)7.65%$3.24 $3.78 $5.30 $5.35 $5.07 $5.39 <br />FUTA 0.6%$0.25 $0.30 $0.42 $0.42 $0.40 $0.42 <br />SUTA 2.52%$1.07 $1.24 $1.75 $1.76 $1.67 $1.78 <br />Industrial Insurance L&I $2.13 $2.13 $2.13 $2.13 $2.13 $2.13 $2.13 <br />Subtotal Direct Labor Costs $49.01 $56.83 $78.93 $79.53 $75.57 $80.22 <br />Safety 2%2.00%$0.98 $1.14 $1.58 $1.59 $1.51 $1.60 <br />Supervision 15%15.00%$7.35 $8.52 $11.84 $11.93 $11.34 $12.03 <br />Small Tools 3%for Prime 3.00%$1.47 $1.70 $2.37 $2.39 $2.27 $2.41 <br />TOTAL $58.81 $68.20 $94.72 $95.43 $90.69 $96.26 <br />Overtime at 1.5x $88.22 $102.30 $142.07 $143.15 $136.03 $144.39 <br />Double Time at 2x $117.63 $136.40 $189.43 $190.87 $181.38 $192.52 <br />Friday &Saturday OT Diff at 1.5x $29.41 $34.10 $47.36 $47.72 $45.34 $48.13 <br />Sunday OT Difference at 2x $58.81 $68.20 $94.72 $95.43 $90.69 $96.26